My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:54:13 PM
Creation date
6/23/2020 6:52:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
604
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vicki McCartney [EH] <br />From: nicholelmccall@gmail.com <br />Sent: Thursday, November 10, 2016 4:39 PM <br />To: Vicki McCartney [EH] <br />Subject: FW: Service request for Pacific Avenue Chevron at 6633 PacificAvenue,Stockton <br />Let me know if you would like me to add this to the form <br />Nikki McCall <br />MVP Petroleum Engineering, Inc. <br />From: Mark Vendeiro <br />Sent: Thursday, November 10, 2016 1:17 PM <br />To: nicholelmccall@gmail.com <br />Subject: Re: Service request for Pacific Avenue Chevron at 6633 PacificAvenue,Stockton <br />The vapor recovery piping in the converted diesel fill sump will be plugged at the tank entry <br />fitting with a black iron plug. <br />The vapor recovery piping entering the diesel fill sump will be capped with a black iron cap. <br />The electronic line leak detector will remain in place. We will not change this leak detector. <br />The thermal coefficient of expansion in the Veeder Root TLS 350 will be changed to reflect <br />the diesel product when we program the Veeder Root after the cold start. <br />The cold start is necessary as the Air Pollution Control Board requires the latest software <br />revision to be installed on a major change and to install the ISD software. <br />Thank you, <br />Mark Vendeiro <br />MVP Petroleum Engineering,Inc. <br />mvpeng@att.net <br />916-205-1537 <br />On Thursday, November 10, 2016 12:57 PM, "nicholeimccall@gmail.com" <nicholelmccall@gmail. com> wrote: <br />Can you answer these? <br />Nikki McCall <br />MVP Petroleum Engineering, Inc. <br />From: Vicki McCartnev f EHj <br />Sent: Thursday, November 10, 2016 12:55 PM <br />To: nicholeimccall@gmaii.com <br />Subject: Service request for Pacific Avenue Chevron at 6633 Pacific Avenue,Stockton <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.