Laserfiche WebLink
Our work scope: <br />row"ECEIVED <br />Drawings and Permits NOV 0 4 2016 <br />• Provide Air Pollution Department Authority to Construct permit fee <br />• Provide San Joaquin County Hazardous Materials construction permit fee ENVIRONMENTAL HEALTH <br />DEPARTMENT <br />Remove and dispose of the existing dispensers <br />Remove and leave on site the existing assist vapor meters <br />Leave hanging hardware on site <br />Install owner Bravo conversion frames <br />Install owner provided Wayne Ovation dispensers - three 3+0 and three 3+1 <br />install owner provided hanging hardware <br />Install owner provided lighted spanners - use existing spanner power <br />Install owner provided Veeder Root vapor meters and monitoring console upgrades <br />Provide for conversion of one tank to diesel- To better group the tanks we propose to change the N <br />tank to 91 and the 91 tank to diesel. This will leave the gasoline tank next to each other to facilitate <br />fuel deliveries <br />Cap the unused diesel piping above the impact valve in the three 3+0 dispenser locations <br />Disconnect the vapor piping connection in the diesel tank fill sump <br />Disconnect the diesel tank vent riser from the vent manifold, install rain cap <br />Install owner provided diesel leak detector and diesel float kit for the tank gauge, provide leak <br />detector testing <br />Veeder •Root console after new software is installed <br />m inspM10 r-pjjgd,&7u-tjjjtoring system and <br />Provide for Hazardous �aterjals final monitoring sYste <br />leak detector testing report <br />Provide for post construction vapor testing <br />