Laserfiche WebLink
Page 2 of 3 <br />1. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />® Pressure <br />❑ Other (Specify) <br />❑ Vacuum <br />❑ Hydrostatic <br />Test Equipment Used: See attached testing procedures <br />Equipment Resolution: <br />Piping Material: <br />Piping Run # 87 <br />Fiberglass <br />Piping Run # 91 <br />Fiberglass <br />Piping Run # Piping Run # <br />Piping Manufacturer: <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />Length of Piping Run: <br />Approx 200' <br />Approx 200' <br />Product Stored: <br />Gas 87 <br />Gas 91 <br />Method and location of <br />piping -run isolation: <br />Test boot in sump <br />Test boot in sump <br />Test boot in sump Test boot in sump <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 minutes <br />30 minutes <br />30 minutes 30 minutes <br />Test Start Time: <br />10:47am <br />11:40am <br />Initial Reading (RI): <br />5 psi <br />5 psi <br />Test End Time: <br />11:47am <br />12:40pm <br />Final Reading (RF): <br />5 psi <br />5 psi <br />Test Duration: <br />1 hour <br />1 hour <br />1 hour 1 hour <br />Change in Reading (RF-Rj): <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0.00 <br />0.00 <br />0.00 0.00 <br />:as <br />anag <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Repairs made pursuant to San Joaquin County Permit SR0069769 & Stockton Fire Permit <br />Inspectors Stacy Rivera (SJC) and Robert Kubena (SF) were present during testing <br />