Laserfiche WebLink
June 11, 2014 <br />San Joaquin County <br />Environmental Health Department <br />1868 East Hazelton <br />Stockton,♦ 95205-6232 <br />Jim Alexander <br />Wayne Perry <br />30 Main Ave Suite #5 <br />Sacramento, CA, 95838 <br />Re: Chevron Station #96171 <br />6633 Pacific Ave, Stockton, CA, 95207 <br />DIRECTOR <br />Donna Heran, REHS <br />PROGRAM COORDINATORS <br />Robert NlcClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Kasey Foley, REHS <br />Linda Turkatte, REHS <br />Rodney Estrada, REHS <br />Adrienne Ellsaesser, REHS <br />SR0069769 <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the application for a permit to replace all penetration fittings in all under dispenser containments <br />with Bravo fiberglass penetration fittings on the underground storage tank (UST) system at the <br />above noted address. The permit has been approved with the following conditions: <br />Contact the local fire department and the San Joaquin Valley Air Pollution Control <br />District for any applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Contact Thuy Tran at (209) 468-8257 to arrange the following inspection appointments <br />(a 48-hour notice is required for inspection appointments). Please be aware that <br />inspections for emergency work must be scheduled within five days of permit approval. <br />a. Secondary containment testing on all UDC sumps and product piping. <br />Please be aware that the facility cannot operate the UST system prior to the EHY <br />inspection and approval. <br />4. Secondary containment testing for the UDC sumps and product piping are required six <br />months after installation. Provide 48 hours notification to the EHD when this test is <br />scheduled. <br />5. Log into the California Environmental Reporting System (CERS), complete and submit a <br />"UST Certification of Installation/Modification" form for the penetrations installed in the <br />UDCs. <br />6. Qualified service technicians must possess or work under the direct and personal <br />supervision of an individual physically present at the work site who possesses all of the <br />following: <br />