My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:54:13 PM
Creation date
6/23/2020 6:52:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
604
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ff <br /> LIST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1, Site map enclosed? YES Pq NO(I ALI <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training%'it 6i Gi each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the"Site Health and Safety <br /> Plan'is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component,describe how this will be done. (If <br /> adding piping, UDC's,or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 48 as necessary for a timely plan review): <br /> Replace all(6)wdsfiM dispensers,change tank 3 unleaded to diesel,trench,install piping from tan.,3 <br /> to ie front(3)disDensers UCCs with Smith Fiberolass Dloina. &Q-LLI j&,,1�AodVhI&J <br /> C. <br /> lu M la 67 CArAaar 12 0 941 <br /> 0 <br /> ---CA61ba-j <br /> A <br /> La2 itn j ras ii 2zuat� <br /> tz <br /> ;L CZ;i Q A S-K <br /> -773 rvilu 4eo- 'o P101 I <br /> e <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> Smith W fiberglass red thread 21p2 and associated elbows and couplings. <br /> Smith 4"fiberalass red thread sga piping with associated elbows,couplings,and termination�fift�s. <br /> A <br /> tm P, ILA <br /> a&-db,41j1- 3 <br /> A 1 &00 <br /> A-V1)ffL&L±2L <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.