Laserfiche WebLink
08/24/2006 12:05 <br />5592665371 <br />PAGE 01 <br />Ftalmowe-s-Compost im PIPE GRouP <br />EpoxyPSX"**20 Adhesive Kit <br />sxane adhesive for bondingfiber- <br />glass <br />Description PSX-20 adhesive is a patented two-part epoxy siioxane adhesive designed for <br />permanently joining fiberglass pipe and fittings with taper/taper joints. PSX-20 is a <br />non -flowing thixotropic paste offered in easy-to-use kits. The PSX•20 epoxy adhesive <br />kit contains an adhesive resin, hardener, mixing spatula, brush and assembly instruc- <br />tions. The adhesive resin Is a dark red paste with sand, The adhesive hardener is a <br />white paste. The mixed adhesive color is red. PSX•20 Can be used to connect epoxy, <br />vinyl ester or phenolic systems. <br />Listings and approvals Ameron PSX•20 adhesive is lasted by Underwriters Laboratories (UL) under File MH <br />8162 for use in Nonmetallic Underground Piping for Flammable Liquids. PSX•20 <br />adhesive is particularly suited for piping systems conveying petroleum products <br />S role L�i including diesel fuels, kerosene, etc., alcohols and alcohol -gasoline mixtures, or <br />oxygenated fuels. It is also approved by Underwriters Laboratories for use with <br />MTBE fluids, <br />re ion of Using the sandpaper supplied in the adhesive kit, clean both surfaces thoroughly to <br />bonding surface remove all dirt, grease and foreign materials. Make store the bonding surfaces are free <br />of moisture. <br />Do not touch the bonding surfaces with bare hands, dirty or greasy gloves or rags <br />after cleaning them. <br />Mixing the adhesive In cold weather it Is necessary to warm the resin to 50°F (10°C) to permit good mixing <br />and easier application. <br />Open both resin and hardener containers. Using the stick supplied, put all of the <br />hardener into the resin container. Never split a kit. <br />Pot life and At 77°F (25°C) the pot life of PSX-20 adhesive is 20 to 30 minutes. The pot life <br />Cure time decreases with rising temperatures: <br />Adhesive Minimum Joint <br />Temperature Pot Life (min.) Cure Time <br />(minutes) (hours) <br />50 10 70 12 - <br />65 18 40 6 <br />75 24 25 4 <br />95 35 10 9 <br />In extremely cold or windy conditions, use insulation to prevent rapid dissipation of <br />heat from the cure reaction. Cap the ends of the piping to prevent the passage of cold <br />air. In severe cold conditions, warm air may be blown through the interior of the pipe. <br />A heat cure is recommended for installations with service temperatures above 180°F <br />(82°C) or operating pressures over 300 psi. For ambient temperature conditions below <br />50°F (1 o°C), an external heat cure must be used. A minimum heat cure time of at least <br />30 minutes is recommended for 2- through 6 -inch pipe. Even after the adhesive has <br />turned solid at ambient temperatures, heat curing will promote chemical cross-linking <br />of the adhesive, thus increasing its strength, temperature resistance and corrasion <br />resistance. A single Chem Cure Pak may be applied or an Ameron-approved electric <br />heat blanket may be used. The heat cure may be applied at any time after the bond is <br />made and before the pipe has been tested or put into service. <br />u.s. Patent No, 4250074, 4257645 FP698A (5/01) <br />