Laserfiche WebLink
UN[FUD PROGRAM CONSOUDATED FORM <br /> UNDEItGROUNDSTORAGETANK <br /> MONITORING PLAN-(Page 2 of 2} <br /> (Check all <br /> VI.UNDER DISPENSER CONTAINMENT(uDc)moNrrORING that a0910 <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) 490-54a. <br /> I CONTINUOUS ELECTRONIC MONITORING 0 2.FLOAT AND CHAIN ASSEMBLY 0 3.ELECTRONIC STAND-ALONE 490-54b <br /> El 4.NO DISPENSERS [] 99.OTHER(Specify) 490-56. <br /> LEAK MONITOR MANUFACTURER i2fit-r - 490-". MODEL#: -T-1-S *3 SV_ <br /> LEAK SE14SOR MANUFACTURER: &XH& 490-57- MODEL#(S)--7c?(4.3 TO Zt 490-58. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. YES 0 b.NO 49D-39. <br /> R . <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. aYES ❑ b.NO 490-60 <br /> FAILUREIDISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. FD a.YES ❑ b.NO <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER- a.YES ❑ b.NO <br /> 490 62 <br /> UDC CONSTRUCTION IS: 1.SINGLE WALL ❑ 2.DOUBLE WALL 490.63. <br /> 490-64& <br /> IF DOUBLE WALL <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: [I a.LIQUID ❑ b.PRESSURE [1c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. 0 &YES D &NO 49"4' <br /> VM PERIODIC SYSTEM TES <br /> 1.ELD TESTING:THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49ae3. <br /> LEAK DETECTIOWA&W-MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.123 ccR§2644.11 490-66. <br /> 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490.67. <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. <br /> VIII. RECORD]KEEPING <br /> The following monitoringlinaintenance:records are kept for this facility: 490-68. <br /> 0 a-ALARM LOGS 0 b-VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> 0 d.SIR TESTING RESULTS(mid supporting documentation records) ❑ e.TANK GAUGING RESULTS(and SUPPOrtIng d0cuircoMm=Olds) <br /> 0 f.ATG TESTING RESULTS(and supporting documentation records) 0 g.CORROSION PROTECTION 60-DAY LOGS <br /> 0 IL E2UIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> UL 111AINING <br /> 0 Personnel with UST monitoring responsibilities are farmitar with all of following documents relevant to their job duties: 490-69& <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) 49M9b- <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 49049C. <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(RequiFem 490-69d. <br /> 0 CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69e <br /> 0 CALIFORNIA UNDERGROUND STORAGE TANK LAW ' <br /> 0 STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: -HANDBOOK FOR TANK OWNERS MANUAL AND 490-W <br /> STATISTICAL INVENTORY RECONCILIATION" 490-699 <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 49"9 <br /> ❑ OTHER(Specify): 490-69i. <br /> This facility has a"Designated UST Operator"who has passeilthe California UST System Operator Exam administered by the international Code Council 490-70 <br /> (ICC). The -Designated UST Operator-will train facility employees in the proper operation and maintenance of the UST system annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> • operation of the UST systems in a manner consistent with the facility's best management practices. <br /> 1 1 <br /> • The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> • The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> • Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X COMMENTS/ADDITIANAL INFORMATION-I' 490-71. <br /> ProvideN additional commej Z_L_nes here or indicate how many-r)pajes with additional info r45Rmation on spectfic;monitoring procedures are attached to this plan. <br /> FVEN - 4s- J-- 7--owX cAeA CIV V <br /> TAX (2 fi-tj " -VA4AK S1,5771* <br /> XL PERSONNEL SPANS EL <br /> The UST owner/operator is responsible for ensuring that: 1.)thedaily/routme UST monitoring activities and namterance of UST leak detection equipment covered <br /> . �y this plan occurs;2.)all conditions that indicate a possible release are investi&gg and 3.)all monitoring records we maintained property. <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING5 THE MONITORING AND EQUIPMENT MAINTENANCE: 490-73. <br /> NAME: A Li 49o-72 TITLE: EAPL,911FE - 490-75. <br /> 90.74. TITLE: <br /> NAME: e*� MA-kAAL MA WA IL 4 <br /> The Designated UST operator shall perform a monthly visual inspection of the facility,provide a report to the owned r,and inform the owner/operator of any <br /> conditions that need follow-up action- <br /> XII. OVVNER/OPE RATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge, 4W77. <br /> APPLICANT SIGNATURE DATE, 6-17-OF <br /> mpmemwa 0 1,T-*0-wi jzWof 0w= 490.76. 490-79. <br /> APPLICANT NAME(print): /Vo APPLICANT TITLE- <br /> AIV'r JV F# -5'-4I <br /> www.unidocs.org <br /> UPCF UST-D(12/Mn-3/4 <br />