My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
34243
>
2300 - Underground Storage Tank Program
>
PR0231801
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 9:30:26 AM
Creation date
6/23/2020 6:52:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231801
PE
2361
FACILITY_ID
FA0003290
FACILITY_NAME
COUNTRY MART GAS & FOOD
STREET_NUMBER
34243
Direction
S
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95304-9334
APN
25318004
CURRENT_STATUS
01
SITE_LOCATION
34243 S CHRISMAN RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231801_34243 S CHRISMAN_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run# 1 Piping Run#2 Piping Run#3 Piping Run#4 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron Ameron Ameron <br /> Piping Diameter: 3" 3" 3" 3" <br /> Length of Piping Run: 140' 160' 30' 100' <br /> Product Stored: Regular 87 Super 91 Diesel Diesel <br /> Method and location of Test boot at STP Test boot at STP Test boot at STP Test boot at STP <br /> piping-run isolation: Piping Sump#1 Piping Sump#2 Piping Sump#3 Piping Sump#4 <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> pressure and starting test: <br /> Test Start Time: 10:05 8:45 10:10 8:55 <br /> Initial Reading(Ri): 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time: 11:05 9:45 11:10 9:55 <br /> Final Reading(RF): 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-RI): 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass Pass Pass <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Note: Replaced Secondary Pipe Test Boot at STP Piping Sump#1,for Regular 87 Tank#1,prior to testing. <br /> Note: Replaced Secondary Pipe Test Boot at STP Piping Sump#3,for Diesel Tank#3,prior to testing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.