My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
34243
>
2300 - Underground Storage Tank Program
>
PR0231801
>
COMPLIANCE INFO_2007-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 9:10:07 AM
Creation date
6/23/2020 6:52:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2011
RECORD_ID
PR0231801
PE
2361
FACILITY_ID
FA0003290
FACILITY_NAME
COUNTRY MART GAS & FOOD
STREET_NUMBER
34243
Direction
S
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95304-9334
APN
25318004
CURRENT_STATUS
01
SITE_LOCATION
34243 S CHRISMAN RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231801_34243 S CHRISMAN_2007-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br />L Training for Ameron 1. Installation training for Ameron Dualoy 3000/L piping systems, including <br />Dualoy Piping Systems secondarily contained systems and Dualoy 3000/LCX, shall be done by an <br />Ameron employee, sales representatve or distributor. <br />2. Training shall, at minimum, consist of a thorough review of the installation <br />instructions (Bulletins, 7501, 8702 and/or 9903) as applicable for the systems <br />on which the installer is to be certified. It is recommended that an installation <br />video, (such as "Dualoy 3000/LCX Installation") be used during the training <br />session. Also recommended is an examination of the installation tools, a <br />demonstration of the joint preparation and bonding and, if possible, a "hands- <br />on" execution of the installation procedures for a sample connection. <br />3. Upon completion of the training, each individual being trained shall complete the <br />written examination for the systems on which they are to receive qualification. <br />4. The examinations will be signed by the trainee and the instructor and forwarded <br />to Ameron for grading and registering of the individual as a "Certified Installer." <br />5. Ameron will issue a training certificate with the individual identified and will <br />include their name on a registration list. Wallet -sized certificates and hard hat <br />stickers may also be provided. Training certifications are valid for 3 years <br />ii. Glossary & Abbreviations <br />SC — Secondary containment fittings or pipe <br />MV — Motor vehicle fuels <br />Adapters SxM <br />NV — Normal vent line from tank <br />CF — Concentrated fuels <br />(psig) <br />PC — Primary Carrier <br />HB — High blend fuels <br />(psig) <br />PS — Primary/Secondary combined into one unit <br />AM — Aviation and marine fuels <br />200 <br />VR — Vapor recovery <br />200 <br />iii. Pressure Ratings & <br />Dualoy 3000/1- pipe specifications and ratings <br />Specifications of <br />125 <br />125 <br />Products <br />Pipe Size Nominal O.D. Wall Thickness <br />Weight Pressure Rating <br />100 <br />(inches) (inches) (inches) <br />Ib/ft (inches) <br />100 <br />2 2.38 .080 <br />.5 200 <br />100 <br />3 3.50 .085 <br />.7 200 <br />4 4.50 .090 <br />1.0 175 <br />6 6.63 .120 <br />1.9 140 <br />Dim 1107kilif l • • • • . • •I <br />Pipe Size <br />Couplings <br />Adapters BxF <br />Adapters SxM <br />Adapters SxF <br />(inches) <br />(psig) <br />(psig) <br />(psig) <br />(psig) <br />2 <br />200 <br />200 <br />200 <br />200 <br />3 <br />125 <br />125 <br />125 <br />125 <br />4 <br />100 <br />100 <br />100 <br />100 <br />6 <br />100 <br />100 <br />100 <br />100 <br />� • 111 • ,•.• • <br />Pipe Size <br />45°,90° Elbows <br />Reducer Bushings <br />Tees <br />Adapters BxM <br />(inches) <br />(psig) <br />(psig) <br />(psig) <br />(psig) <br />2 <br />200 <br />200 <br />200 <br />200 <br />3 <br />125 <br />125 <br />125 <br />125 <br />4 <br />100 <br />100 <br />100 <br />100 <br />6 <br />100 <br />100 <br />100 <br />100 <br />2 -Piece Clamshell Fittings <br />Pipe Size Dualoy 30001 Dualoy 3000/L Dualoy 3000/LCX <br />(inches) Repair Coupling Containment Fittings Containment Fittings <br />2 200 — 50 — <br />3 125 50 20 <br />4 100 50 20 <br />2 6 100 50 — <br />Pressure rating with stiffening rings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.