My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
34243
>
2300 - Underground Storage Tank Program
>
PR0231801
>
COMPLIANCE INFO_2007-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 9:10:07 AM
Creation date
6/23/2020 6:52:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2011
RECORD_ID
PR0231801
PE
2361
FACILITY_ID
FA0003290
FACILITY_NAME
COUNTRY MART GAS & FOOD
STREET_NUMBER
34243
Direction
S
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95304-9334
APN
25318004
CURRENT_STATUS
01
SITE_LOCATION
34243 S CHRISMAN RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231801_34243 S CHRISMAN_2007-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Piping system layout Trenching, bedding and backfilling <br />Although fiberglass pipe has excellent strength, it must be protected against impact <br />which may occur from improper handling or during backfilling. <br />• Provide a trench width equal to the pipe diameter plus six inches on each side. <br />Separate multiple lines by at least 4 inches. Referto Fig. 6-1. <br />• Provide a minimum of 18 inches of select backfill between the top of the pipe and <br />unpaved ground surfaces. <br />• Provide a minimum of 4 inches of select backfill between the top of the pipe and <br />reinforced concrete pavement (4 inches minimum thickness). <br />• Provide a minimum of 8 inches of select backfill between the top of the pipe and <br />asphalt pavement (2 inches minimum thickness). <br />• Slope the trench bottom evenly from the dispensers back to sumps ortanks at a <br />minimum 'A in/ft of slope. The use of "batter boards" is a very good way to achieve a <br />proper slope. <br />• The trench bottom must be free of hard or sharp objects. <br />• Grade the trench bottom with at least 6 inches of select backfill to provide firm, even <br />support forthe pipe. Compact the subgrade well to prevent differential settling. <br />• Protect the pipe from impact during backfilling and abrasion during operation by <br />surrounding it with a minimum of four inches of select backfill such as washed <br />sand, pea gravel (N -inch maximum) or crushed stone (1h -inch maximum). <br />Fig. 6-1. Use only select materials for <br />bedding and backfilling Dualoy 3000/L fuel <br />handling systems. Native materials are rarely <br />suitable and should not be used. <br />Fig. 6-2. During layout, bonding and <br />inspection, support the piping on 2x4 <br />blocks to keep the joints clean and to <br />keep bedding <br />out of the pipe. <br />None ® <br />Asphalt I <br />• 2 (min) <br />Concrete <br />4 (min) <br />- 16 (min) <br />4`�` <br />a, oq'o14 a- _ <br />�.. ° .. <br />6 (min) <br />4 (min) <br />Select backfill - 6 (mm) <br />Native 4 (mm) 6 (min) <br />SQA <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.