Laserfiche WebLink
F. bi-Tsflk Gauging J SIR Equip et: <br />A <br />Complete the following checklist: <br />0. <br />U Check this box if tank gauging is used only for inventory control. <br />El Check this box if no tank gauging or SIR equipment is installed. <br />P11111 IIIIIIIIII <br />M. "IMM491W. III III IF!''I 1111 LTOIrm "IMM! <br />In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): <br />A <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />Was accuracy of system product level readings tested? <br />Was accuracy of system water level readings tested? <br />For mechanical LLDI does the LLD restrict product fiow if it detects a leak -9 <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): <br />A <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />Page 3 of 3 03/01 <br />---- ----- - - - ------ <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? J <br />(Cheek all that apply) Simulated leak rate: 0 3 g.p.h.; Q 0. 1 g.p.h Ll 0.2 g.p.h. <br />lastpoll MOO NEW <br />For mechanical LLDI does the LLD restrict product fiow if it detects a leak -9 <br />I For electronic LLDs, does the turbine automatically shut off if the LID detects a leak? <br />A <br />For electronic LLDI have all accessible wiring connections been visually inspected? <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />Page 3 of 3 03/01 <br />