Laserfiche WebLink
Page of <br /> 4. SPILL/OVERFILL CONTAINMENT BOXES <br /> Test Method Developed By: ❑UDC Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Uses: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Measuring Equipment Used for Testing: INCON TS-STS V2.1 <br /> Spill Box#D1 Fill Spill Box# Spill Box# <br /> Bucket Diameter: 20" <br /> Bucket Depth: 16" <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Min. <br /> starting test: <br /> Test Start Time: 11:15 <br /> Initial Reading(RI): 4.879 <br /> Test End Time: 11:30 <br /> Final Reading(RF): 4.868 <br /> Test Duration: 15 Min. <br /> Change in Reading(RF-RI): .11 <br /> Pass/Fail Threshold: .002 <br /> Test Result: Fail <br /> Comments—(include information on repairs made to facilitate a passing test and indicate whether a <br /> permit was obtained for the repairs) <br /> All Hydrostatic test performed twice to insure testing- results <br /> T3 nrro-rn�w4 r............nnnn <br />