My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2002-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 10:16:48 AM
Creation date
6/23/2020 6:52:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2008
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231820_1990 N PICCOLI_2002-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br />A irTnmvu_1r%xcPrxQiM V(-sNTATNMFW ITTDM RF -TESTING <br />Test Method Developed By: cl UDC Manufacturer <br />X Industry Standard C1 Professional Engineer <br />0 Other (Specify) <br />Test Method Used: <br />0 Pressure <br />0 Vacuum X Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: INCON TS -STS V2.1 <br />Equipment Resolution: DAM" <br />OEM= ME= <br />UDC # Disel UOC # <br />UDC # UDC # <br />UDC Manufacturer: <br />Total Containment <br />UDC Material: <br />Plastic <br />UDC De the <br />24" <br />Height from UDC Bottom to Top <br />695 <br />of Highest Pi in Penetration: <br />Height from UDC Bottom to <br />4" <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />Clean <br />testing: <br />Portion of UDC Tested <br />All <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />X Yes 0 No 0 NA <br />product and water)? <br />Turbine shutdown response time <br />4 Seconds <br />Is system�programmed for fail- <br />X Yes 0 No 0 NA <br />safe shutdown?* <br />Was fail-safe verified to be <br />X Yes 0 No 0 NA <br />ope ional?* <br />Wait time between applying <br />pressure/vacuum/water and <br />15 Minutes <br />starting test <br />Test Start Time: <br />12,25 /1:01 <br />Initial Reading (RO, <br />6.3924" / 6.3924" <br />Test End Time: <br />12:40/1:16 <br />Final Reading (RE): <br />6.3923" / 6.3923" <br />Test Duration: <br />15 Minutes * 2 <br />Chane in Readins (RF -U: <br />0.000111/0.00011, <br />Pass/Fail Threshold or Criteria* <br />0.0020" <br />Test Result: <br />0 Pass X Fail <br />Was sensor removed for testing? <br />X Yes 0 No 0 NA <br />Was sensor properly replaced and <br />X Yes 0 No 0 NA <br />I <br />verified functional after tgtinL? <br />— <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Disp OL.- Replaced to electrical QncUajiQn fminz <br />' If the entire depth of the UDC is not testeA specify how much was tested. If the answer to gny of the questions indicated with an <br />asterisk (*) is "Ng' or "NA", the entire UDC must be tested. (See SVIRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.