My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2002-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 10:16:48 AM
Creation date
6/23/2020 6:52:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2008
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231820_1990 N PICCOLI_2002-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In -Tank Gauging / SIR Equipment: 'A( Check this box if tank gauging Is used Only for inventory control. <br />C1 Check this box if n® tank gauging or SIR equipment is installed. <br />Low t., I -4W.4L�L41111 list z <br />Yes I U No* I Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />.......... <br />Was accuracy of system water level readings tested? <br />M, Yes I U No* I Were all items on the equipment manufitcturer's maintenance checklist completed? <br />In the Section K below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Ders (LLD): <br />Vnmntotp the fallawine rheeklixt! <br />* In the Section H, below, describe how and when theft tie enc were or win carr <br />H. Comments: <br />Page 3 of 3 0"1 <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD per onnance? I <br />(Check all that apply) Simulated leak rate: A 3 gp.h.; 0 0.1 g.p.h; Ll 0.2 g.p.h. <br />a <br />Were all LLDs conflrmcd operational and accurate within regulatory requvements? <br />41 <br />- -"- <br />-tects a leak? <br />For mechanical LL6s, -does the LLD restrict product ifitdo <br />Il <br />•For <br />electronic LLDs, I Rme 0 a <br />p2ror,77FT11 5711 T1 i IWO <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />Were all items on the equipment man�W—t rer's maintenance checklist completed? <br />* In the Section H, below, describe how and when theft tie enc were or win carr <br />H. Comments: <br />Page 3 of 3 0"1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.