Laserfiche WebLink
F. In -Tank Gauging / SIR Equipment: 'A( Check this box if tank gauging Is used Only for inventory control. <br />C1 Check this box if n® tank gauging or SIR equipment is installed. <br />Low t., I -4W.4L�L41111 list z <br />Yes I U No* I Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />.......... <br />Was accuracy of system water level readings tested? <br />M, Yes I U No* I Were all items on the equipment manufitcturer's maintenance checklist completed? <br />In the Section K below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Ders (LLD): <br />Vnmntotp the fallawine rheeklixt! <br />* In the Section H, below, describe how and when theft tie enc were or win carr <br />H. Comments: <br />Page 3 of 3 0"1 <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD per onnance? I <br />(Check all that apply) Simulated leak rate: A 3 gp.h.; 0 0.1 g.p.h; Ll 0.2 g.p.h. <br />a <br />Were all LLDs conflrmcd operational and accurate within regulatory requvements? <br />41 <br />- -"- <br />-tects a leak? <br />For mechanical LL6s, -does the LLD restrict product ifitdo <br />Il <br />•For <br />electronic LLDs, I Rme 0 a <br />p2ror,77FT11 5711 T1 i IWO <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />Were all items on the equipment man�W—t rer's maintenance checklist completed? <br />* In the Section H, below, describe how and when theft tie enc were or win carr <br />H. Comments: <br />Page 3 of 3 0"1 <br />