Laserfiche WebLink
0 <br />A. MODERN DOUBLE-WALL <br />SI. ► <br />A. AO OVER DOUBLE <br />,.ii <br />B. • SMITH 2" SINGLE WALL FIBERGLASS. (VENT) <br />3. 915PEtiaER CONJAINMEHI.-(EXISIJM <br />TOTALA. r DEEP :O <br />COMPLIANCE <br />GENERAL CONTRACTOR PROVIDE i` DAYS NOTIFICATION TO GOVERNING <br />PRIOR <br />Yi TOPIPING i.. INSPECTION. <br />TANK SYSTEM TO BE INSPECTEDGOVERNING i <br />SEPARATEi i REQUIRED: <br />1. INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN ACCORDANCE <br />WITH MANUFACTURER'S GUIDELINES. <br />2. FINAL INSPECTION i PORTIONS OF i <br />GENERAL CONTRACTOR SHALL CONDUCTi"ACCORDANCE WITH THE DEPARTMENT <br />OF i OF i' FOR EXCAVATIONS OF <br />OR MORE DEPTH INTO WHICH A PERSONREQUIRED TO DESCEND. <br />i +� Y i ! iI i � iM x l • ... iY <br />A <br />REA (E) BUILDING <br />(E) PARKING ND <br />D � oo � (E} DIES L UST <br />-/ -7' <br />/ <br />,(E) PARKING///////// <br />(E) BUILDING <br />- - PICCOLI ROAD - - - -� <br />• )CATION OF r <br />ww <br />CANOPY <br />i�l <br />r t O. <br />SAW CUT AND REMOVE PORTION CONCRETE DRIVE A3 FOR iY T DISPENSER <br />C CONTRACTOR TO UNCOVER EXISTING UNDER DISPENSER CONTAINMENT AT BOX AT <br />DIESEL DISPENSER <br />(a) CONTRACTOR TO DISASSEMBLE EXISTING ELECTRICAL PENETRATION INSIDE AND OUTSIDE 'I <br />OF DISPENSER.AND DISPOSE OF. i <br />i i' i .i PIPE ENTRY iii ii i !# <br />:ii TO BE INSTALLED PER ALL MANUFACTURER'Si <br />CONTRACTOR TO BACKFILL WITH CLEAN CONTAMINATION FREE SOIL THE EXPOSED <br />UDC BOX AND READY FOR RESURFACING. <br />CONTRACTOR i INSTALL NEW PORTIONOF !SLAB.� CONTRACTOR • <br />DOWELi i .` O.C. <br />REPAIRED UNDER DISPENSER CONTAINMENTBOX TO BE TESTED PER ,yrs GUIDLINES.i <br />SUBMITTEDRESULTS TO SAN JOAQUINCOUNTY <br />1. SAN JOAQUIN COUNTYDEPARTMENT MUST BE PRESENT TO DIRECT <br />AND WITNESS ANY NECESSARY SAMPLING ACTIVITIES. <br />2. NON -CONTAMINATED FROM ORDER TO i l <br />MUST BE SCREENED • TO THE SPECIFICATIONSUSED FOR STANDARD <br />INSPECTOR3. A VISUAL HYDROSTATIC TEST MUST BE PERFORMED W/ S.J.E.H. DEPT. <br />PRESENT BEFORE BACKFILLING BEGINS BUT AFTER CONSTRUCTION <br />COMENCES, TWO 15 MIN. ±.002 TEST WILL BE PERFORMED PURSUINT TO <br />Y . , .GUIDELINES PIPING PENETRATIONBACKFILLING <br />