My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2002-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 10:16:48 AM
Creation date
6/23/2020 6:52:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2008
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231820_1990 N PICCOLI_2002-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />A. MODERN DOUBLE-WALL <br />SI. ► <br />A. AO OVER DOUBLE <br />,.ii <br />B. • SMITH 2" SINGLE WALL FIBERGLASS. (VENT) <br />3. 915PEtiaER CONJAINMEHI.-(EXISIJM <br />TOTALA. r DEEP :O <br />COMPLIANCE <br />GENERAL CONTRACTOR PROVIDE i` DAYS NOTIFICATION TO GOVERNING <br />PRIOR <br />Yi TOPIPING i.. INSPECTION. <br />TANK SYSTEM TO BE INSPECTEDGOVERNING i <br />SEPARATEi i REQUIRED: <br />1. INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN ACCORDANCE <br />WITH MANUFACTURER'S GUIDELINES. <br />2. FINAL INSPECTION i PORTIONS OF i <br />GENERAL CONTRACTOR SHALL CONDUCTi"ACCORDANCE WITH THE DEPARTMENT <br />OF i OF i' FOR EXCAVATIONS OF <br />OR MORE DEPTH INTO WHICH A PERSONREQUIRED TO DESCEND. <br />i +� Y i ! iI i � iM x l • ... iY <br />A <br />REA (E) BUILDING <br />(E) PARKING ND <br />D � oo � (E} DIES L UST <br />-/ -7' <br />/ <br />,(E) PARKING///////// <br />(E) BUILDING <br />- - PICCOLI ROAD - - - -� <br />• )CATION OF r <br />ww <br />CANOPY <br />i�l <br />r t O. <br />SAW CUT AND REMOVE PORTION CONCRETE DRIVE A3 FOR iY T DISPENSER <br />C CONTRACTOR TO UNCOVER EXISTING UNDER DISPENSER CONTAINMENT AT BOX AT <br />DIESEL DISPENSER <br />(a) CONTRACTOR TO DISASSEMBLE EXISTING ELECTRICAL PENETRATION INSIDE AND OUTSIDE 'I <br />OF DISPENSER.AND DISPOSE OF. i <br />i i' i .i PIPE ENTRY iii ii i !# <br />:ii TO BE INSTALLED PER ALL MANUFACTURER'Si <br />CONTRACTOR TO BACKFILL WITH CLEAN CONTAMINATION FREE SOIL THE EXPOSED <br />UDC BOX AND READY FOR RESURFACING. <br />CONTRACTOR i INSTALL NEW PORTIONOF !SLAB.� CONTRACTOR • <br />DOWELi i .` O.C. <br />REPAIRED UNDER DISPENSER CONTAINMENTBOX TO BE TESTED PER ,yrs GUIDLINES.i <br />SUBMITTEDRESULTS TO SAN JOAQUINCOUNTY <br />1. SAN JOAQUIN COUNTYDEPARTMENT MUST BE PRESENT TO DIRECT <br />AND WITNESS ANY NECESSARY SAMPLING ACTIVITIES. <br />2. NON -CONTAMINATED FROM ORDER TO i l <br />MUST BE SCREENED • TO THE SPECIFICATIONSUSED FOR STANDARD <br />INSPECTOR3. A VISUAL HYDROSTATIC TEST MUST BE PERFORMED W/ S.J.E.H. DEPT. <br />PRESENT BEFORE BACKFILLING BEGINS BUT AFTER CONSTRUCTION <br />COMENCES, TWO 15 MIN. ±.002 TEST WILL BE PERFORMED PURSUINT TO <br />Y . , .GUIDELINES PIPING PENETRATIONBACKFILLING <br />
The URL can be used to link to this page
Your browser does not support the video tag.