My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2002-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 10:16:48 AM
Creation date
6/23/2020 6:52:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2008
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231820_1990 N PICCOLI_2002-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />MODERNA. r DOUBLE-WALL TYPE <br />DOUBLE <br />(PRODUCT) <br />S. AOFIBERGLASS. <br />3. <br />r , . <br />COMPLIANCEA. TOTAL CONTAINMENT DEEP BOX <br />• <br />GENERAL CONTRACTOR PROVIDE WORKING DAYS NOTIFICAnON TO GOVERNING <br />..• TOPIPING OR <br />INSPECTIONTANK SYSTEM TO BE INSPECTED BY OWNER'S ENGINEER & GOVERNING AGENCY AT TWO (2) <br />SEPARATE CONSTRUCTION PHASES AS REQUIRED: <br />1. OF ALL SECONDARYCONTAINMENT,f ACCORDANCE <br />WITH MANUFACTURER'S GUIDELINES. <br />2. FINAL INSPECTION IN! PORTIONS OF DETECTION <br />GENERAL CONTRACTOR SHALL CONDUCT THEIR WORK IN ACCORDANCE WITH THE DEPARTMENT <br />OF !CALIFORNIA)FOR EXCAVATIONS OF <br />5'-0" OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND. <br />ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED 'PURPOSE INCLUDING <br />METHANOL AS PER NATIONALLY RECOGNIZED CODES, LOCAL CODES AND GOVERNING AUTHORI <br />E (E) BUILDING <br />1 3 <br />(E) PARKING 6 7 <br />(E) DISPENSER & ISLAND <br />\ \ \ \ \ \ 0 <br />®® 0 <br />(E) DIESEL UST <br />1 <br />,(, PARKING ///////// <br />(E) BUILDING <br />— — PICCOLI ROAD — — — —� <br />r t E OF ► <br />IMCIZ-1141"'It CANOPY & TANKS ARE APPROXIMATE. <br />THIS DWGJS EOR r <br />lEgEND <br />(E) EXISTING <br />(N) NEW <br />,/ �,✓ , 'f CONCRETE TO BE DEMOLISHED AND REPLACED <br />CONSIRQCTIO. • <br />REMOVE(aDSAW CUT AND PORTION CONCRETEDRIVE FOR WORK AT DISPENSER <br />(DCONTRACTOR TO UNCOVER EXISTING UNDERDISPENSER CONTAINMENTBOX AT <br />DIESEL DISPENSER <br />CONTRACTOR(�DCONTRACTOR TO DISASSEMBLE EXISTING ELECTRICAL PENETRATION INSIDE AND OUTSIDE <br />OF DISPENSER AND DISPOSE OF. <br />CD CONTRACTOR TO INSTALL (1) ENVIRON 1" PIPE ENTRY BOOT MODEL #FEB -3100, <br />BOOT TO BE INSTALLED PER ALL MANUFACTURER'S GUIDLINES. <br />CONTRACTOR TO BACKFILL WITH CLEAN CONTAMINATION FREE SOIL THE EXPOSED I <br />UDC BOX AND READY FOR RESURFACING. <br />• INSTALL NEW PORTION OF • CONTRACTOR TO <br />DOWEL INTO EXISTING CONCRETE TANK SLAB W/ #3 x 18" STEEL BARS AT 12" O.C. <br />(:f) REPAIRED UNDER DISPENSER CONTAINMENT BOX TO BE TESTED PER S8989 GUIDLINES.1 <br />RESULTS SUBMITTED TO SAN JOAQUINCOUNTY <br />Coljnty .- <br />1. SAN .=r . , BE <br />NECESSARYAND WITNESS ANY SAMPLING <br />2. NON -CONTAMINATED BACK -FILL FROM THE SITE, IN ORDER TO BE RE -USE , <br />MUST BE SCREENED t TO THE SPECIFICATIONSUSED FOR STANDARD <br />3. A VISUAL HYDROSTATIC TEST MUST BE PERFORMED DEPT. <br />INSPECTOR PRESENT BEFORECONSTRUCTION <br />COMENCES, TWO 15 MIN. ±-002 TEST WILL BE PERFORMED r <br />'.. f • t GUIDELINES 2" PAST HIGHEST PIPING PENETRATION <br />AND CONCRETEDEPT.i. IS PRESENT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.