Laserfiche WebLink
0 <br />• Page 6 of 6 <br />8. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer X hdwky Sundard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />❑ Pressure ❑ Vacuum X HY054r k <br />❑ Other (Specify) <br />Test Equipment Used: INCON TS -STS V2.1 Equipment Resolution: 0.0000" <br />Spill Box # T1 Fill Spill Box # Spill Bog # Spill Bos # <br />Bucket Diameter: 12" <br />Bucket Depth: <br />16" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test.: <br />15 Minutes <br />Test Start Time: <br />8:35 /8:52 <br />Initial Reading (R,): <br />6.1488" / 6.1488" <br />Test End Time: <br />8:50 / 9:07 <br />Final Reading (RF): <br />6.1489" / 6.1490" <br />Test Duration: <br />15 Minutes * 2 <br />Change in Reading (RF -R& <br />0.0001" / 0.0002„ <br />Pass/Fail Threshold or <br />Criteria: <br />0.0020" <br />Test Result: <br />X F' ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />All Hvdrostatic Test Performed Twice To Ensure Testinp, Results. <br />