								        	UST Operating Permit Applin-Tank Information Instructions
<br />    	(Formerly SWRCB Permit Application Fo     and UPCF Form hwfwrc-b)
<br />    	Complete a separate form for each UST for all new permits,permit changes,and any UST system information changes. This form must be submitted within 30 days of
<br />    	permit or UST system information changes,unless your local agency requires approval prior to making changes.For tanks that are part of a compartmentalized unit,
<br />    	each compartment is considered a separate tank and requires completion of a separate Tank Information form.For a UST permanent closure or removal,complete only
<br />    	TYPE OF ACTION and Sections I,II,III,IV,and IX.(Note: Numbering of these instructions matches the data element numbers on the form.)
<br />    	430.   TYPE OF ACTION-Check the appropriate box to indicate why this form is being submitted.
<br />    	430a.  DATE UST PERMANENTLY CLOSED-For reporting closure only:enter the date the UST was removed or closed on site.
<br />    	430b.  DATE EXISTING UST DISCOVERED-Enter the date this UST was discovered.Leave blank if installation date is known.
<br />    	1.      FACILITY ID NUMBER-This space is for agency use only.
<br />    	3.      BUSINESS NAME-Enter the complete facility name.
<br />    	103.   BUSINESS SITE ADDRESS-Enter the street address of the facility,including building number,if applicable. This address must be the physical location of
<br />   		the facility.Post office box numbers are not acceptable.
<br />    	104.   CITY-Enter the city or unincorporated area in which the facility is located.
<br />    	432.   TANK ID#-Applicant may enter the owner's tank identification number or leave this space blank.The Local Agency will assign the State tank identification
<br />   		number as the unique identifier for the tank.
<br />    	433.   TANK MANUFACTURER-Enter the name of the company that manufactured the tank.
<br />    	434.   TANK CONFIGURATION.Check the appropriate box to indicate if the tank is a stand-alone tank or one in a compartmented unit.A separate UST Operating
<br />   		Permit Application-Tank Information form must be submitted for each compartment.
<br />    	435.   DATE UST SYSTEM INSTALLED-Enter the date the local agency signed-off on installation of the UST system. This is the date of initial tank system
<br />   		installation,and does not include upgrades or retrofits which may have been performed later.If this is for a new installation,leave blank.
<br />   	436.   TANK CAPACITY IN GALLONS:Enter the tank capacity. For compartmentalized tanks,enter data for the compartment covered by this tank form only.
<br />   	437.   NUMBER OF COMPARTMENTS IN THE UNIT:If the tank is a compartment,enter the total number of compartments in the unit.
<br />   	439.   TANK USE-Check the type of tank usage.
<br />   	439a.  If you checked"Other"specify the type of tank usage in the space provided.
<br />   	440.   TANK CONTENTS-Check the specific petroleum or non-petroleum substance stored.
<br />   	440a.  If you checked"Other Petroleum"specify the common name of the substance in the space provided[i.e.,the name used in the facility's Hazardous Materials
<br />   		Business Plan(HMBP)inventory].
<br />   	440b.  If you checked"Other"under Non-petroleum,specify the common name of substance in the space provided(i.e.,the name used in the HMBP inventory).
<br />   	443.   TYPE OF TANK-Check the box that identifies the type of tank.
<br />   	444.   TANK PRIMARY CONTAINMENT-Check the construction material of the primary containment(i.e., inner tank wall nearest the hazardous substance
<br />   		stored). If the tank material is not listed,check"Other"and specify the material in the space provided.
<br />   	444a.  If you checked"Other"specify the type of primary containment in the space provided.
<br />   	445.   TANK SECONDARY CONTAINMENT-Check the construction material of the secondary containment that provides containment external to,and separate
<br />   		from,the primary containment described above. If the tank is a single-wall tank,check"None." If the material is not listed,check"Other"and specify the
<br />   		material in the space provided(e.g.,HDPE).
<br />   	445a.  If you checked"Other"specify the type of secondary containment in the space provided.
<br />   	452    OVERFILL PREVENTION-Check the box(es)to describe the type(s)of overfill protection equipment installed.
<br />   	458.   PIPING SYSTEM TYPE - Check the type of product/waste piping installed in this tank system.  "Safe suction" refers to piping systems meeting all
<br />   		requirements of 23 CCR§2636(a)(3)(also known as"European Suction"systems)(i.e.,sloped suction piping systems with no valves or pumps below grade
<br />   		and only one check valve, located below and as close as practical to the suction pump).  Title 23, California Code of Regulations is available online at
<br />   		www.calre2s.com.
<br />   	460.    PIPING CONSTRUCTION-Indicate if the piping is single-walled or double-walled,or"other".
<br />   	464.   PIPING PRIMARY CONTAINMENT-Check the material(s)used to construct the primary(i.e.,inner)underground product/waste piping.
<br />   	464a.  If you checked"Other"specify the type of primary containment in the space provided.
<br />   	464b.  PIPING SECONDARY CONTAINMENT-Check the material(s) used to construct the secondary containment system(s) (i.e., secondary piping,trench)
<br />   		provided for the product/waste piping.For single-wall piping systems,check"None."
<br />   	464c.  If you checked"Other"specify the type of secondary containment in the space provided.
<br />   	464d.  PIPING/TURBINE CONTAINMENT SUMP TYPE-Indicate the type of piping/turbine containment sump(s).Check"None"if not present.
<br />   	464e-el VENT PRIMARY CONTAINMENT-Check the material(s)used to construct the primary(i.e.,inner)vent piping. (Note:Address venting of the tank primary
<br />   		containment only.)Specify Other type of containment in the space provided.
<br />   	464f-fl VENT SECONDARY CONTAINMENT-Check the material(s)used to construct the secondary containment system(s)(e.g.,secondary piping,)provided for
<br />   		the vent piping. For single-wall piping systems, check "None."  (Note: Address venting of the tank primary containment only.) Specify Other type of
<br />   		containment in the space provided.
<br />   	464g-gl VR PRIMARY CONTAINMENT-Check the material(s)used to construct the primary(i.e.,inner)vapor recovery piping. For tanks without vapor recovery
<br />   		piping(e.g.,Diesel tanks),check"None." Specify Other type of containment in the space provided.
<br />   	464h-hl VR SECONDARY CONTAINMENT-Check the material(s)used to construct the secondary containment system(s)(e.g.,secondary piping)provided for the
<br />   		vapor recovery piping.For single-wall piping systems,check"None." Specify Other type of containment in the space provided.
<br />   	4641.   VENT PIPING TRANSITION SUMP TYPE-Indicate type of transition sump(s).Check"None"if not present.
<br />   	464j-j 1 RISER PRIMARY CONTAINMENT-Check the material(s)used to construct the primary(i.e.,inner)piping for all risers(not drop tubes)other than annular
<br />   		space risers(i.e.,risers for filling or gauging of the primary tank). Specify Other type of containment in the space provided.
<br />   	464k-kl RISER SECONDARY CONTAINMENT-Check the material(s)used to construct secondary containment system(s)(i.e.,secondary piping,sumps)provided
<br />   		for the riser piping.For risers without secondary containment,check"None." Specify°Other type of containment in the space provided.
<br />   	451a-c. FILL COMPONENTS INSTALLED-Check the appropriate boxes to show that spill containment, tank bottom protection,and fill containment sumps(if
<br />   		applicable)are installed.
<br />   	469a.  UDC CONSTRUCTION TYPE-Check the box to describe the type of dispenser containment system(s)(i.e.,dispenser sumps or pans). If the system has no
<br />   		dispensers(e.g.,standby generator tank system),check"No Dispensers." If the system has a dispenser,but no UDC,check"None".
<br />   	469b.  UDC CONSTRUCTION MATERIAL-Check the box to describe the materials used to construct the UDC.
<br />   	469c.  If you checked"Other"specify the construction material in the space provided.
<br />   	448.   STEEL COMPONENT PROTECTION-All systems contain some steel components. Check the appropriate box(es)to describe all corrosion protection
<br />   		methods used.  "Isolation" means electrical isolation from soil, backfill, and groundwater.  Examples include fiberglass cladding, non-metallic secondary
<br />   		containment systems which isolate steel components from the sub-surface environment,and insulating bushings.
<br />   	APPLICANT SIGNATURE-The same person who signs the UST Operating Permit Application-Facility Information Form shall sign in the space provided. This
<br />   		signature certifies that the signer believes that all information submitted is true and accurate, and that the UST system is compatible with the hazardous
<br />   		substance stored.
<br />   	470.   DATE-Enter the date the form was signed.
<br />   	471.   APPLICANT NAME-Print or type the name of the person signing the form.
<br />   	472.   APPLICANT TITLE-Enter the title of the person signing the form.
<br />   	UPCF UST-B-2/2															Rev.(12/2007)