Laserfiche WebLink
Test Date: 16 Jun 19 9 3 Work Order#: 9 6116 6 <br /> ULLAGE TESTING DATA <br /> Tank 1 Tank 2 Tank 3 Tank 4 Tank 5 Tank 6 <br /> Product: DIESEL <br /> True Capacity-gal: 3, 500 <br /> Ullage volume-gal : 632 <br /> Fluid pressure <br /> on tank bottom(psi) : 1.76 <br /> Ullage test pressure: 2.00 <br /> Stabilization time: 10 <br /> Fill start time: 10:20 <br /> Time to 1 PSI : 1 <br /> Time to test pressure: 2 <br /> Start time - test 1: 10 :35 <br /> Nitrogen flow (cfh) : 0.20 <br /> Ullage temperature-F: 75 .3 <br /> Finish time - test 1: 10:45 <br /> Nitrogen flow (cfh) : 0 .10 <br /> Start time - test 2 : 10:45 <br /> Nitrogen flow (cfh) : 0.20 <br /> Ullage temperature: 75 .4 <br /> Finish time - test 2: 10:55 <br /> Nitrogen flow (cfh) : 0 .12 <br /> Start time - test 3 : 10: 55 <br /> Nitrogen flow (cfh) : 0.20 <br /> Ullage temperature-F: 75 .5 <br /> Finish time - test 3 : 11:05 <br /> Nitrogen Flow (cfh) : 0. 00 <br /> Pass/Fail: PASS <br /> ULLAGE TEST COMMENTS: <br /> NOTE: [2 consecutive test @ < 0.275 constitute a PASS][3 consecutive test e > 0.275 constitute a FAIL <br /> NDE Environmental Corporation-20000 Mariner Avenue Ste 500-Torrance,CA.90503-(310)542-4342 Page 2 <br />