My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
907
>
2300 - Underground Storage Tank Program
>
PR0231871
>
COMPLIANCE INFO_1986-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:04:06 PM
Creation date
6/23/2020 6:53:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1997
RECORD_ID
PR0231871
PE
2361
FACILITY_ID
FA0003968
FACILITY_NAME
AT&T California - UE046
STREET_NUMBER
907
Direction
W
STREET_NAME
LINCOLN
STREET_TYPE
Rd
City
Stockton
Zip
95207
APN
077-470-07
CURRENT_STATUS
01
SITE_LOCATION
907 W Lincoln Rd
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231871_907 W LINCOLN_1986-1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 ® r <br /> lip <br /> 3B-Relntoread Diamond Plate <br /> with special cam lock mach's. Tubular <br /> and Grade 8 Cad Plated Bolts -O•Ring <br /> with seals. <br /> 12 Ga.Rolled <br /> Steel Frame High Density Polyethylene Nylon Collector <br /> Sump Shield#SC-3001-SS <br /> I <br /> t <br /> INSTALLATION INSTRUCTIONS <br /> To set the elevation for the fiberglass sump, the optimum over sump and spill collector bucket. It may be to your <br /> position should be 8" below finished concrete or asphalt advantage to leave offspill collector bucket "O"ring on this <br /> grade. This allows a I" overlap for steel spill collector initial installation and after concrete is poured then remove <br /> frame when itis elevated I"above finished concrete grade. lid and install "O"rings to final installation. <br /> This elevation setting also positions the light weight high Besure when lidand frame areinstalled that 36"lidis atleast <br /> density polyethylene sump shield, number SC-3601-SS to 1"above finished concrete grade andthat collector bucketis <br /> the right position for eliminating water intrusion. Cut the 2•below flange in collector. <br /> 4" SIl pipe riser to a length of 14 1/2' below 5nfshed r <br /> concrete grade. (Not the 1" elevated grade) If these instructions are followed you should have an <br /> ARer all grades are set and tanks are back filled to top of attractive and easy installation. <br /> fiberglass sump, Spill Collector can be installed. Now SUMP COVER LID REMOVAL <br /> install the light weight high-density p-ty a-sem For ease ofi emoval we have hrmishedJack screws. First, <br /> shield with the proper openings cut out. Then install the tum affhold down bolts(1/2 Hex)counter clockwise to stop. <br /> nylon spill collector bucket, hand tighten against "O"ring, Next,remove button head alien screws(Do not d/sca rd)rnsert <br /> if the Spill Collector is used on the vapor side install vapor "7"handle Jack screws in threaded hole(if T"handles are <br /> spill collector now. (Vapor spill collector is different. It is not available use 5/16"-18 bolts)and raise lid. When lid is <br /> 1"shorter on the 4"riser, be sure to check this). free from collector bucket "O"ring use "T'handle to lift lid <br /> ')w the spill collectorfid and frame can be installed. Using from sump. <br /> ..,e cam lock mechanism to fasten the lid to the Same by To replace L'd simply lower lid over spill collector buckets. <br /> turning bolts clockwise until cams inter-lock with dimples Remove-T-handles and press lid into place, tum hex bolts <br /> in frame, then tighten approximately one tum more to clockwise until pressure is felt, then in cross lid tightening = <br /> tighten down against seal. (Do this in a cross Had pattern pattern, tighten bolts to draw lid down against the seal <br /> which will apply even pressure on seal). After the lid is evenly. Please re-Install the betton headatren scrvws- <br /> properly installed on the frame. it can now be positioned <br />
The URL can be used to link to this page
Your browser does not support the video tag.