Laserfiche WebLink
GALLON CONVAULT 'ABOVE PACIFIC BELL ENGINEER <br /> ENWHILE EXISTING TANK IS BEING <br /> ElAND FILTER FUEL FROM <br /> P-OP-05M INST-4,11AT1011A <br /> G AND CONCRETE TANK SLAB AS <br /> 4,000 GAL. UNDERGROUND -)I <br /> GIN ACCORDANCE WITH THE V <br /> RE ON SHEET P-6. rA aag 7PN4A-r+CPN gmr3wNi <br /> �uiP ,PE:0T TFJ <br /> RIG PANEL LOCATED IN ENGINE ` Q C KT �-q p1 T' 'EIRE: RR R;vV1171'lqa ' <br /> 1fE WALL UNDERGROUND FUEL <br /> AGS AND MANUFACTURERS <br /> T3 FOR EQUIPMENT FURNISHED BY <br /> IDE ALL OTHER MATERIALS, LABOR <br /> CONTRACTOR SHALL COORDINATE <br /> 0 DELIVERY OF OWNER FURNISHED 7 <br /> HIRING SYSTEM. r' <br /> ' PING WITHIN 4" ENViROFLEX <br /> U OIL SUPPLY,AND RETURN LINES, G' <br /> AND ATTACH TO EXISTING <br /> i, <br /> i <br /> I UILDING'ALLEY. USE MATERIALS, <br /> THAT MATCHES EXISTING SEAL BY LOCAL ENGINEER <br /> NEL WITH LIQUID SENSORS, LEVEL H. LON & ASSOCIATS13i _ s <br /> r, ER DRAWINGS AND <br /> TIONS. <br /> 1137 ND.wcoowELL SLNn. * PETALLMA.CA 94854 • C7=785-1 <br /> REQUIRED FOR INSTALLATION OF icHN w.jCH,,9 ra AFCHTECT Jug K PAY.Crn <br /> rNG SYSTEM. <br /> 4K--AND PIPING IN COMPLIANCE WITH <br /> i <br /> OR TESTING. <br /> 45_79.605 AND 79.708 <br /> G TANK REGULATIONS <br /> _S AND TANKS. �s <br /> -EffS, BACKFILL TANK EXCAVATION <br /> I WAGRAVEL AND POUR NEW NO. REVISIONS / AUTHORIZATIONS DATE BY <br /> NG SITE DRAINAGE. <br /> 441AREA WHERE TANK IS LOCATED,. <br /> )FRINAL LAYOUT, COVER <br /> SHEET <br /> :ONTRACTOR SHALL ARRANGE A FINAL <br /> FIJBELL AND ROBERT H. LEE AND <br /> DRAWINGS PREPARED FOR <br /> PACIFIC <br /> SACRAMENTO, CAUFORNIA <br /> FACILITY ADDRESS <br /> IL 1 100% <br /> 907 LINCOLN <br /> 1S T 0 C K"rl N C A L I F 0 6rrmi N I A <br /> CZ�q\ DATE: 1/22/97 DRAWN -BY: KGM j <br /> 1 <br /> PRO.lECT ENGINEER CHECKED BY: J. MCGRATH <br /> EST/RO NO. SHEET 1 OF 7 SHEETS <br /> APPROVED DRAWING NO. <br /> -1 <br />