Laserfiche WebLink
F. Preventative maintenance, calibration, certification to manufacturer's specification and repair <br /> for the UST monitoring system and associated hardware are performed on a minimum <br /> annually. <br /> • SBC - Environmental Management Control Center directs, manages, and schedules <br /> all maintenance and repairs for the California and Nevada region's, UST's, piping, <br /> associated hardware, and UST monitoring systems preventative maintenance, <br /> calibration, certification and repairs. <br /> • Currently SBC - Environmental Management Control Center(California&Nevada <br /> region)has an annual contract with Tait Environmental Systems, 701 North <br /> Parkcenter Drive, Santa Ana, CA 92705, Phone (714) 560-8222 or fax (714) 560- <br /> 8237 to perform Calibration and field services. <br /> ® Secondary Containment testing will be performed every 36 months in accordance <br /> with the California Code of Regulations, Title 23, Division 3, Chapter 16, Section <br /> 2637. <br /> G. Training: <br /> • SBC Hazardous Materials/Wastes Management Handbook, Section 20 Titled <br /> "Underground and Aboveground Storage Tanks" describes the methods and <br /> procedures company employees follow for underground and aboveground storage <br /> tank and monitoring systems. <br /> • UST and the Veeder Root TLS-350 monitoring system operating instructions are on- <br /> site. On-site training is performed on initial start-up of the UST monitoring system <br /> and refresher training is performed on an as needed basis. Training includes this <br /> Underground Storage Tank Monitoring Plan and the Operating manuals for <br /> electronic monitoring equipment. <br /> • UST facility employee training will be completed by the Designated Operator for <br /> new employees within 30 days of the hire date. Annual refresher training will be <br /> conducted every 12 months thereafter. <br /> I:gIAZMAWACBELLFORMS\SBC Monitor Plan template.doc <br /> Printed: July 21,2006 page 4 <br />