My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
907
>
2300 - Underground Storage Tank Program
>
PR0231871
>
COMPLIANCE INFO_1998-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:51:51 PM
Creation date
6/23/2020 6:53:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2008
RECORD_ID
PR0231871
PE
2361
FACILITY_ID
FA0003968
FACILITY_NAME
AT&T California - UE046
STREET_NUMBER
907
Direction
W
STREET_NAME
LINCOLN
STREET_TYPE
Rd
City
Stockton
Zip
95207
APN
077-470-07
CURRENT_STATUS
01
SITE_LOCATION
907 W Lincoln Rd
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231871_907 W LINCOLN_1998-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
354
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. AMPILL/OVERFILL CONTAINMENT BOXE <br />Facility is Not Equipped With Spill/Overfill Containment Boxes <br />pill/Overfill Containment Boxes are Present, but were Not Tested <br />Test Method Developed By: Spill Bucket Manufacturer ® Industry Standard Professional Engineer <br />Other (Specify) <br />Test Method Used: Pressure Vacuum ® Hydrostatic <br />Other (Spec) <br />Test Equipment Used: VISUAL / MEASURE Equipment Resolution: N/A <br />Spill Boa # 1 Spill Box Spill Box # Spill Box # <br />DIESEL FILL <br />Bucket Diameter: 12" <br />Bucket Depth: 14" <br />Wait time between applying <br />pressure/vacuum/water and 5 MINUTES <br />starting test: <br />Test Start Time: 11:30 <br />Initial Reading (RI): 6" <br />Test End Time: 12:30 <br />Final Reading (RF): 6" <br />Test Duration: 1 HOUR <br />Change in Reading (RF -RI): 0 <br />Pass/Fail Threshold or 0 <br />Criteria: <br />Test Result• Pass Fail ❑ Pass Fail Pass Fail Pass Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.