Laserfiche WebLink
Site Address: 907 LINCOLN ROAD, STOCKTON Date of Testing/Servicing: 8/15/02 <br />F. In -Tank Gauging / SIR Equipment: ® Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the foil ne cnecacusi: <br />® Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />® Yes <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />® Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />® Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />® Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />EECYes� <br />-6 No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): N Check this box if LLDs are not installed. <br />Com fete <br />❑ Yes <br />the ion owan <br />❑ No* <br />cnecium; <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak rate: ❑ 3 g.p.h. 1; ❑ 0.1 g.p.h 2; ❑ 0.2 g.p.h 2 <br />Notes: 1. Required for equipment start-up certification and annual certification. <br />2. Unless mandated by local agency, certification required only for electronic LLD start-up. <br />❑ Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />❑ Yes <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />rC]No* <br />❑ Yes <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />[I N/A <br />or disconnected? <br />E] Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />❑ N/A <br />malfunctions or fails a test? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />Page 3 of 3 °„°i <br />