My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
907
>
2300 - Underground Storage Tank Program
>
PR0231871
>
COMPLIANCE INFO_2009-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:56:31 PM
Creation date
6/23/2020 6:53:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2018
RECORD_ID
PR0231871
PE
2361
FACILITY_ID
FA0003968
FACILITY_NAME
AT&T California - UE046
STREET_NUMBER
907
Direction
W
STREET_NAME
LINCOLN
STREET_TYPE
Rd
City
Stockton
Zip
95207
APN
077-470-07
CURRENT_STATUS
01
SITE_LOCATION
907 W Lincoln Rd
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231871_907 W LINCOLN_2009-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.TANK ANNULAR TESTING <br /> Test Method Developed By: Tank Manufacturer F1 Industry Standard r Professional Engineer <br /> Other(Specify) <br /> Test Method Used: r Pressure F vacuum r—Hydrostatic <br /> r Other(Specify) <br /> Test Equipment Used: 4" Dial Guage Equipment Resolution: .2 <br /> No=Tank Tank Tank Tank <br /> UE046UO02 <br /> Is Tank Exempt From Testing?(1) r Yes F— No r Yes r No r Yes r No r Yes r No <br /> Tank Capacity: 4,010 gal <br /> Tank Material: Steel/Fiberglass <br /> Tank Manufacturer: Modern Welding <br /> Product Stored: Diesel <br /> Wait time between applying <br /> pressure/vacuum/water and 15 min. <br /> starting test: <br /> Test Start Time: 9:30 am <br /> Initial Reading(Rj): -10"hg <br /> Test End Time: 10:30 am <br /> Final Reading(RE): -10"hg <br /> Test Duration: 1 hour <br /> Change in Reading(RF-Rd: 0 <br /> Pass/Fail Threshold or Criteria: 0 <br /> Test Result: F Pass F Fail Pass^ p�Fail Pass <br /> rFail Pass F Fait <br /> Was sensor removed for testing? rd Yes No 6 NA Yes B No I NA Yes i No i. NA Yes r No r NA <br /> Was sensor properly replaced and <br /> verified functional after testing? r Yes r No NA r Yes r No r NA r Yes r No r NA r Yes r Nor NA <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> The sensor was reinstalled to the lowest point, but not tested <br /> i <br /> a <br /> I <br /> i <br /> I <br /> j <br /> (1)Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic <br /> containment testing. I Cali forni a C ode of Regu lati ons,Title 23, Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.