My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
907
>
2300 - Underground Storage Tank Program
>
PR0231871
>
COMPLIANCE INFO_2009-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:56:31 PM
Creation date
6/23/2020 6:53:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2018
RECORD_ID
PR0231871
PE
2361
FACILITY_ID
FA0003968
FACILITY_NAME
AT&T California - UE046
STREET_NUMBER
907
Direction
W
STREET_NAME
LINCOLN
STREET_TYPE
Rd
City
Stockton
Zip
95207
APN
077-470-07
CURRENT_STATUS
01
SITE_LOCATION
907 W Lincoln Rd
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231871_907 W LINCOLN_2009-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Materials required for this decontamination will consist of: plastic sheeting, polyethylene bags, <br />sufficient water for soaping and rinsing, several large tubs, TSP soap, brushes, hand soap <br />toweling, and drums. <br />�, •11�Jul�►�1 <br />The Contractor will decontaminate all contaminated equipment utilized before it is used at <br />another locale, or before the equipment leaves the site. Any contaminated material, other <br />than soil samples will be placed in metal drums or covered in plastic and stored on site, <br />according to Federal, State and Local Regulatory Agencies, until the material is analyzed for <br />future disposal. <br />The following equipment/materials could be utilized for decontamination of the heavy <br />equipment: 55 -gallon drums, polyethylene bags, labels and signs, trough/wash area, and <br />portable steam cleaner. <br />While the UST excavation activities are in progress, the subcontractor is to provide a First -Aid <br />Kit, eyewash kit, fire extinguisher, and sorbent material for personnel at a site being worked. <br />Field personnel will not be allowed to eat, drink, or smoke within the Exclusion Zone. These <br />activities will be permitted only in areas designated by the SSHO. <br />The use of contact lenses for vision correction is acceptable unless Self Contained Breathing <br />Apparatus (SCBA) use is required. Also, certain job functions may require the removal of <br />contact lenses, even with the use of approved eye protection, such as mixing chemicals, fiber - <br />glassing operations, welding, and potential H2S exposure. Contacts shall not be used as a <br />substitute for approved eye protection. <br />Personnel with facial hair, except those with mustaches that do not interfere with the proper <br />fit of the respirator, will not be permitted into work areas as facial hair interferes with fitting of <br />respirators. <br />Work will be performed during daylight hours only, unless approved by SSHO. <br />Formal periods of rest for personnel may be required in hot weather and/or during strenuous <br />activity. <br />5/21/09 revision 5 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.