Laserfiche WebLink
1 <br />r�A <br />S. Make a U -Turn at VALENCIA AVE onto W HAMMER LN <br />6. Arrive at 1148 W HAMMER LN, STOCKTON, on the Right <br />On-site personnel will use the following standard emergency procedures. The SSHO shall be <br />notified of any on-site emergencies and be responsible for ensuring that the appropriate <br />procedures are followed. <br />Upon notification of an injury, the SSHO will assess the nature of the injury. If the cause of <br />the injury does not affect the performance of site personnel, operations may continue, with <br />the appropriate on-site field personnel initiating the appropriate First -Aid and necessary follow- <br />up. If the injury increases the risk to others, all field personnel shall be moved to a safe <br />location until further instructions. <br />In the event of a fire or explosion on site, the Fire Department well be summoned. All site <br />personnel shall assemble at "rally point" a safe distance from the involved area. <br />If any site worker experiences a failure or alteration of protective equipment that effects the <br />protection factor, that person shall immediately stop that particular work activity and repair or <br />replace the failure. Should the failure of the personal protection equipment be unrepairable, <br />and then that worker will stop that work activity and report the failure to the SSHO. That site <br />worker will be reassigned to other work activity not requiring that particular PPE and shall not <br />be permitted to allowed to continue the previous work activity until the equipment has been <br />repaired or replaced. <br />If any other equipment on site fails to operate properly, the SSHO shall be notified and <br />determine the effect of this failure on continuing operations on site. If the failure affects the <br />5/21/09 revision 5 15 <br />