Laserfiche WebLink
SAN JOAQUIN COUNTY PUBLIC HEALTH SERVICES -ENVIRONMENTAL HEALTH DIVISION <br />UNDERGR "VD STORAGE TANK PROGRAM WORKSHEET <br />FACILITY NAME <br />FACILITY CONTACT NAME <br />$500 FEE INCLUDES FACILITY FEE + 1 TANK <br />$125 PER TANK AFTER FIRST TANK <br />1996-1999 <br />($170) X (# tanks) X (# of years applicable) <br />FACILITY ADDRESS <br />SITE PHONE # WITH AREA CODE <br />TEMPORARY CLOSURE FEE = $267 / FACILITY <br />TANK ID # (s) : <br />CITY <br />STATE <br />ZIP CODE <br /># OF TANKS AT SITE <br />$ r- <br />CA <br />$ <br />APPLICANT BILLING NAME <br />APPLICANT CONTACT NAME <br />$500 FEE INCLUDES FACILITY FEE + 1 TANK <br />$125 PER TANK AFTER FIRST TANK <br />1996-1999 <br />($170) X (# tanks) X (# of years applicable) <br />APPLICANT MAILING ADDRESS <br />APPLICANT PHONE # WITH AREA CODE <br />TEMPORARY CLOSURE FEE = $267 / FACILITY <br />TANK ID # (s) : <br />CITY <br />STATE <br />ZIP CODE <br />CIRCLE WORK TO BE DONE: <br />Closure Installation Repair Retrofit <br />$ r- <br />TANK PENALTY ASSESSED <br />ACTIVE FACILITY <br />TANK ID # s): <br />$500 FEE INCLUDES FACILITY FEE + 1 TANK <br />$125 PER TANK AFTER FIRST TANK <br />1996-1999 <br />($170) X (# tanks) X (# of years applicable) <br />2000 <br />2001 <br />TEMPORARY CLOSURE FEE = $267 / FACILITY <br />TANK ID # (s) : <br />PLAN CHECK FEE = $712 / FACILITY <br />! <br />$ <br />$ r- <br />TANK PENALTY ASSESSED <br />$ <br />SAMPLING INSPECTION FEE _ $ 89/ HOUR <br />TANK SURCHARGE _ / TANK <br />$ <br />STATE SURCHARGE FOR FACILITIES NOT ALREADY ON INVENTORY IN A CUPA PROGRAM = / FACILITY <br />PERMANENT CLOSURE <br />Removal or Permitted Closure in Place <br />TANK ID # s): <br />CLOSURE FEE = $267 / TANK <br />I # TANKS X $267 = <br />TEMPORARY CLOSURE <br />Plan Review and Inspections) <br />TANK ID # (s) : <br />TEMPORARY CLOSURE FEE = $267 / FACILITY <br />m <br />INSTALLATION PLAN CHECK <br />Plan Check and Construction Inspections) <br />TANK LINING REPAIR FEE = $267 / TANK <br /># TANKS X $267 = <br />$ <br />$ <br />( <br />TANK ID # (s) : <br />PLAN CHECK FEE = $712 / FACILITY <br />! <br />REPAIR PLAN CHECK <br />TANK ID # (s): <br />TANK LINING REPAIR FEE = $267 / TANK <br /># TANKS X $267 = <br />$ <br />TANK RETROFIT REPAIR FEE = $267 / FACILITY <br />$ <br />PIPING REPAIR FEE = $267 / FACILITY <br />$ <br />MISCELLANEOUS <br />TRANSFER FEE _ $ 20 <br />$ <br />CONSULTATION FEE _ $ 89/ HOUR <br />$ <br />UNAUTHORIZED RELEASE EVALUATION FEE = $ 89 / HOUR <br />$ <br />SAMPLING INSPECTION FEE _ $ 89/ HOUR <br />ALL FEES ARE BASED ON THE $89 HOURLY RATE. TIME THAT EXCEEDS FEES PAID WILL BE BILLED TO APPLICANT. <br />OFFICE USE ONLY <br />SERVICE REQUEST #FACILITY ID AMOUNT RECEIVED CHECK # RECEIVED BY DATE RECEIVED <br />SR <br />EH 23 032 (REVISED 8-1-011 <br />