My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2300 - Underground Storage Tank Program
>
PR0231901
>
COMPLIANCE INFO_2001-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:23 AM
Creation date
6/23/2020 6:53:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2004
RECORD_ID
PR0231901
PE
2361
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231901_3330 N AD ART_2001-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. Set peak voltage of holiday detector at 10,000 volts. If Scotch-kote 202 is used, set peak voltage of <br />holiday detector at 1,000 volts. <br />d. Repair holidays and damaged or defective wraps with two complete wraps of tape. <br />e. Do not backfill wrapped or coated pipe until testing and repairs have been completed and approved. <br />f. Remove temporary blocks prior to backfilling trench. <br />F. Tracer Lines: Install tracer wire on fuel, vent, vapor return, and electrical conduits for future detection <br />purposes. <br />G. Piping Leak Test: <br />1. Perform a precision piping leak test by a certified Tank Testing Contractor upon completion of tank <br />installation. <br />2. Isolate piping from tank for test. <br />3. Test in accordance with LGJ procedures. <br />4. Test Length: 30 minutes without a drop in pressure. <br />5. Make leak or defective piping tight with new material. a <br />6. Submit results of test to State, showing tanks and piping are leak -free. <br />3.06 TANK FUEL LEVEL SENSOR AND LEAK DETECTION SYSTEM <br />A. Installation: In accordance with manufacturer's written recommendations. <br />B. Panel Location: Locate fuel level sensor and leak detection panels in gas/oil house. Coordinate exact <br />location with Construction Supervisor. §' <br />3.07 SENSOR CABLES <br />A. Installation: Install tank fuel level sensor cables and leak monitoring cables in 1 inch conduit. <br />3.08 FLEXIBLE CONNECTION <br />A. Application: Install flexible connections at following locations and at any other location where required but <br />not specifically mentioned: <br />1. Between shear -off valve and fuel piping from tank under dispenser; at secondary tank vent connection; <br />2. At tank -to -piping (fuel, vent, and vapor return) connections; <br />3. At changes in direction of piping: (fuel, vent, and vapor return); <br />4. Inside containment sump: Between submersible fuel pump and fuel supply piping to dispensers; and at <br />primary tank vent piping to extractor -fitting connections. <br />3.09 EMERGENCY FUEL SHUT-OFF VALVE <br />A. Installation: Install on fuel product lines under fuel dispenser and set level with top of island surface level. <br />3.10 PROTECTION, CARE AND CLEANING <br />A. Protect materials and equipment against moisture, dirt and damage. For piping to be tested with water, <br />drain and flush to remove foreign matter. Blow out air, oil, vacuum and gas piping with cor:,°or®ssed air. <br />Clean piping, valves, and equipment installed under this work. <br />UNDERGROUND FUEL STORAGE TANK <br />070601:HTL:lc:cw 13215 -24 CH 107517 / 107518 <br />
The URL can be used to link to this page
Your browser does not support the video tag.