Laserfiche WebLink
Feb. 26. 2013 10:30AM <br />SWR03, January 2002 <br />RUMEX CONSTRUCTION No.8254 P. 8 <br />0 0 Page — <br />m <br />Bucket Diameter- <br />Spill Box# 87v <br />liff <br />Spill Box # 87f <br />lift <br />Spill Boxff <br />Spill Box# <br />Bucket Depth: <br />13" <br />Wait time between applying <br />pressure/vacuunVwater and <br />"tin & test; <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Test Start Time. <br />1:411 <br />1.411 <br />Initial Reading 011�}1 <br />6.71891 <br />6.64281 <br />Test End Time: <br />1:561 <br />1-561 <br />Final Reading (Rr): <br />6,71951 <br />6.64211 <br />Test Duration: <br />15 min <br />15 min <br />I hour <br />I hour <br />Change in Reading (Kr -RT): <br />.00061 <br />.00071 <br />1 <br />Pass/Fail Threshold or <br />Criteria-, <br />.002 <br />.002 <br />I <br />X pad. ":--EJ)Fsfl <br />x Ni 0 Fail <br />0 Pass 0 Vail <br />-Comments — (include informadon on repairs made prior to testinff, and recommended follow-upforfailed tests) <br />1. <br />