Laserfiche WebLink
Feb. 26, 2013 10:30AM <br />SWRCB, January 2002 <br />RUMEX CONSTRUCTION No -8254 P. 13 <br />Aft <br />is IV Page — of <br />9. SPH.JJOV"ERFIELL CONT NT ROWS <br />Facility is Not Equipped With Spill/Overfill Containment Boxes 0 <br />Spill/Overfill Containment ]Boxes are Present, but were Not Tested 0 <br />Test Method Developed By: 0 Spill Bucket Manufacturer 0 Industry Standard 0 Professional Engineer <br />gmeer <br />0 Other (Specify) <br />Test Method Used: 0 Pressure 0 Vacuum M Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: %ninment. Reqn1ijunn- <br />Bucket Diameter: <br />Spill BOO 87f Spill Box 4 87Y Spin 8014 Spill Box# <br />1111 1111 <br />Bucket Depth: <br />1311 13" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 MfNUTIES 30 MINUTES <br />Test Start Time: <br />1:41 1:41 <br />Initial Reading (Rj): <br />6.6428 6.7189 <br />Test End Time: <br />1:56 1:56 <br />Final Reading (RF); <br />6,6421 6.7195 <br />Test Duration; <br />15 min 15 min <br />Change in Reading (Rp-RO: <br />.0007 .0006 <br />Pass/Fail Threshold or <br />Criteria: <br />.002 .002 <br />T4t.. RLsWt.- <br />X pass 0 Fat) X Pass OFAII <br />Comments — (include information on repairs mads prior to testing, sand recommended follow-up for failLed tests) <br />1. <br />