Laserfiche WebLink
Sm 6, 2012 11:05AM RUMEX CONSTRUCTION No -5773 P. 3 <br />SWRCB, January 2002 Page — of <br />,11mi 11 1 <br />HIU1 ��ill, ''1 11 11 1 1 11 11 1 11 '' <br />11JH <br />Facility is Not Equipped With SpiWOverfill Containment Boxes 0 <br />S2ill/Overfill Containment Boxes are Present but were Not Tested 0 <br />Test Method Developed By: <br />EJ Spill Bucket Manufacturer 0 industry Standard 13 Professional Engineer <br />Ej Other (Specify) <br />Test Method Used: <br />Q Pressure 0 Vacuum <br />0 Other (Specify) <br />®R Hydrostatic <br />Test Equipment Used: Incon Sump Tester Equipment Resolution: <br />Spill Box# 87 F Spill 901 # Spw Box # SPM Box# <br />Bucket Diameter <br />Bucket Depth: <br />1301 <br />Wait time bewom applying <br />pressure/vacuum/water and <br />starting test: <br />30 Minutes 30 Minutes <br />30 Minutes 30 Minutes <br />Test Start Time: <br />1:36 <br />Initial Reading (Ri): <br />93/411 <br />Test End Time,: <br />2,36 <br />Final Reading (Rx): <br />9 3/4" <br />Test Duration. <br />I hour 15 Minutes <br />15 Minutes 15 Minutes <br />Change in Reading (RF-R� : <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />.002 '002 <br />.002 .002 <br />EFs" <br />COMMents — (include information on repairs made prior to testing, and recommendedfollon-y for f <br />2 ailed tests) <br />RJR BUCKET AND 13RASS ADAPTER, RETESTED. <br />