Laserfiche WebLink
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, CA 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sjgov.or ehd <br />FACILITY NAMEFACILITY <br />TANK ID # (s): <br />CONTACT NAME <br />r e GC <br />��>>— <br />l 0 C e- <br />_ i Irv\ L�r� <br />FACILITY ADDRESS <br />I <br />SITE PHONE # WITH AREA COPE <br />3330 <br />1-330 <br />to <br />CITY <br />CIRCLE WORK TO BE DONE <br />STATE <br />ZJP CODE <br />I # OF TANKS AT SITE <br />Closure Installation a air Retrofit <br />CA <br />S - <br />APPLICANT BILLING NAME <br />TANK ID # (s): <br />APPLICANT CONTACT NAME <br />2006 <br />( <br />SkQ <br />APPLICANT MAILING ADDRESS <br />I <br />APPLICANT PfiONE # WITH AREA CODE <br />I <br />1-330 <br />CITY <br />STATEI ZIP CODE <br />CIRCLE WORK TO BE DONE <br />CONTRACTOR ICC # <br />r <br />9,_A-7 <br />Closure Installation a air Retrofit <br />ACTIVE FACILITY <br />TANK ID # (s): <br />CLOSURE FEE = $375 / TANK <br />2006 <br />2007 <br />2008 <br />2009 <br />2010 <br />2011 <br />$500 FEE INCLUDES FACILITY FEE + 1 TANK (2006-2007) <br />PIPING REPAIR FEE = $375 / FACILITY (use for piping, under -dispenser containment, ect. <br />UNAUTHORIZED RELEASE EVALUATION FEE = $ 125 / HOUR <br />$ <br />SAMPLING INSPECTION FEE = $ 125/ HOUR <br />$550 FEE INCLUDES FACILITY FEE + 1 TANK (2008-2011) <br />$125 PER TANK AFTER FIRST TANK <br />$ <br />TANK PENALTY ASSESSED <br />TANK SURCHARGE = $15 / TANK <br />STATE SURCHARGE FOR FACILITIES NOT ALREADY ON INVENTORY IN A CUPA PROGRAM =$49.00/ FACILITY <br />PERMANENT CLOSURE <br />Removal or Permitted Closure in Place <br />TANK ID # (s): <br />CLOSURE FEE = $375 / TANK <br /># TANKS X $375 = <br />TEMPORARY CLOSURE <br />Plan Review and Inspections) <br />TANK ID # (s) : <br />TEMPORARY CLOSURE FEE = $375 / FACILITY <br />INSTALLATION PLAN CHECK <br />(Plan Check and Construction Ir <br />TANK ID # (s) : I PLAN CHECK FEE = $1,000 / FACILITY <br />REPAIR PLAN CHECK <br />TANK ID # (s) : t <br />$ <br />$3-7S.— <br />3-i5.TANK <br />TANK RETROFIT REPAIR FEE = $375 / FACILITY (use for monitoring equipment, cold starts, EVR upgrades, <br />spill buckets, sumps, misc. <br />CONSULTATION FEE = $ 125/ HOUR <br />PIPING REPAIR FEE = $375 / FACILITY (use for piping, under -dispenser containment, ect. <br />UNAUTHORIZED RELEASE EVALUATION FEE = $ 125 / HOUR <br />MISCELLANEOUS <br />$ <br />TRANSFER FEE _ $ 25 <br />$ <br />CONSULTATION FEE = $ 125/ HOUR <br />$ <br />UNAUTHORIZED RELEASE EVALUATION FEE = $ 125 / HOUR <br />$ <br />SAMPLING INSPECTION FEE = $ 125/ HOUR <br />ALL FEES ARE BASED ON THE $125 HOURLY RATE. TIME THAT EXCEEDS FEES PAID WILL BE BILLED TO APPLICANT. <br />TOTAL AMOUNT DUE $3� S, <br />OFFICE USE ONLY <br />SERVICE REQUEST # FACILITY ID AMOUNT RECEIVED CHECK # RECEIVED BY DATE RECEIVED <br />EH 23 032 (REVISED 08/1/11 by KF) <br />