Laserfiche WebLink
L <br />0 1 , 94k V 0 Zt011 <br />_a <br />Following are the minimum qualifications, duties and responsibilities assigned to all site <br />personnel: <br />Project Manager (PM): <br />Hazardous waste field investigation experience <br />Knowledge of work plan procedures, equipment and materials <br />Training (40 hour, 3 day site specific) <br />Respirator fit tested and trained <br />Heath and Safety Officer (HSO): <br />Trained Health and Safety Professional or equivalent <br />Site safety experience in hazardous waste field investigations <br />Knowledge of work plan procedures, equipment and materials <br />Knowledge of standard site safety procedures, equipment and materials <br />Training (40 hour, 3 day site specific) <br />Respirator fit tested and trained <br />Site Safety Officer (SSO): <br />Site safety experience in hazardous waste field investigations <br />Knowledge of work plan procedures, equipment and materials <br />Knowledge of standard site safety procedures, equipment and materials <br />Air monitoring instrument calibration and use <br />Respiratory protective equipment maintenance and use <br />Training (40 hour, 3 day site specific) <br />Respirator fit tested and trained <br />Project Personnel (PP): <br />Training (40 hour, 3 day site specific, 8 hour refresher) <br />Respirator fit tested and trained <br />Air monitoring instrument calibration and use <br />Site Description: <br />Non -retail fueling station at CHP facility <br />Topographic map attached? Yes No X <br />Location map attached? Yes X No <br />r <br />Obiective: <br />Remove and replace drain valve in 87 fill bucket. Retest. <br />W <br />