My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2300 - Underground Storage Tank Program
>
PR0231901
>
COMPLIANCE INFO_2005-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:24 AM
Creation date
6/23/2020 6:53:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2018
RECORD_ID
PR0231901
PE
2361
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231901_3330 N AD ART_2005-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02�J07/2012 15:17 12099438661 <br />CHP STOCKTON <br />11 <br />UST System Designated C"rator Facility,Employce Training Record — Page 2 of 2 <br />UNDERGROUND STORAGE TANK SYSTEM <br />A A L ces A �fl I Rizid I ( I My W 61 %Wi 61 k- li a 7R 311 V�Vt <br />W-ITVT.T*T,M- <br />Facitity Site Address: 3330 N. Ad Art Rd — City- Stockton <br />PAGE 03/03 <br />Section 2715 of Title 23, California Code of Regulations, requires that Designated Underground Storage Tank Operators <br />provide training to facility employees who have responsibilities associated with the operation and/or maintenance of <br />underground storage tank (UST) systems. This training must be provided by July .1, 2005, and every 12 month,-, thereafter, For <br />facility employees hired after July 1, 2005, the initial training must be provided within 30 days of the date of hire. At least one <br />of the -facility employees present during operating hours must have current training. This training must include, but is not <br />limited,to,.ffie fallowing item as,-sp=iBzdiv23 CCR Sections 2715(f)(1) and (2): <br />Operation of the UST system in a manner consistent with the facility's Best Management Practices, <br />The employee's role with regard to UST monitoring equipment as specified in the written UST Monitoring Plan; <br />The employee's role with regard to spills and overfills as specified in. the writ -ten UST Response Plan; <br />Name(s) of contact person(s) for emergencies and monitoring equipment alarms; <br />For facilities that are not routinely staffed, facility employee responsibilities as specifled in the training program <br />approved by the local UST regulatory agency. <br />23 CCR § 2715(f)(3) requires that a list of employees who have been trained by the Designated Underground Storage Tank <br />Operator(s) be maintained on-site, or, off-site at a readily -available location if Wrovedby the local ggggggy, and provided to <br />the local agency upon request Completion of this form will satisfy UST training record keeping requirements- The following <br />employees have been trained as required by 23 CCR Sections 2715(0(1) and (2): <br />5. Facility Employee Name <br />Trajniqg Date <br />Hi jre Date' <br />Trainer Name <br />r,, YA\A O.K. <br />4,7 <br />1 If hired after July 1, 2005. <br />1 Trainer must be a current Designated UST Operwor for the facility at the time of training. <br />2/2 <br />07/1.3/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.