Laserfiche WebLink
a , <br />SWRCB, January 2002 <br />9. SPILL JOVERFILL CONTA <br />Facility is Not Equipped With Spill/Overfill Containment Boxes 0 <br />Spill/Overfill Containment Boxes are Present, but were Not Tested 0 <br />Test Method Developed By: <br />0 Spill Bucket Manufacturer <br />0 Other (Spec) <br />Test Method Used: <br />0 Pressure <br />0 Other (Spec) <br />Test Equipment Used: MTS Mag Probe W/ TDU Meter <br />Spill Box # 1 — 87 <br />: <br />BuTtimebetween <br />12" <br />Bu <br />12" <br />Wait applying <br />pressure/vacuum/water and <br />10 Min. <br />starting test: <br />Test Start Time: <br />12:04 <br />Initial Reading (RI): <br />0.000" <br />Test End Time: <br />12:28 <br />Final Reading (RF): <br />0.000" <br />Test Duration: <br />24 Min <br />Change in Reading (RF -RI): <br />.000" <br />Pass/Fail Threshold or <br />+/- <br />Criteria: <br />.004" <br />Test Result: <br />X Pass []Fall <br />0 Industry Standard <br />0 Vacuum <br />Page -7 of <br />X Professional Engineer <br />X Hydrostatic <br />Resolution: .001" <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />