Laserfiche WebLink
San Joaquin Valley Unified Air Pollution Control District <br />Pressure Decay Test TP201.3 <br />Confirmation No,: 07-6oqj Testing Company: h1,4 L <br />Permit No.: <br />Site ,4 <br />ds, - 9%epolti(rr eft 90-095 <br />.44 19 <br />Address: 33:30- 1 -3 20(e <br />Phone: ;F -v!2 <br />Phase I System? C2 /C- <br />oaielal Tanks Manifolded? -4VIA <br />Phase 11 System?%ALanL#/ Assist i Other: <br />Total Number of Nozzles OZ <br />Nozzles for Tank #1 Nozzles for Tank #3 <br />Nozzles for Tank #2 Nozzles for Tank #4 <br />Balance "Nozzle End" hoses must be drained prior to test. Number of hoses over loomL <br />Tank InfOrmation <br />1. Product Grade <br />1 <br />7 <br />2 <br />3 <br />4 <br />ALL <br />2. Actual Tank Capacity, gallons._ <br />-0 <br />[J`. <br />3. Gasoline Volume, gallons <br />62, <br />E. tillage, LV)j.p!Ions (fine #2 minus line #3 <br />15. Start Time <br />6. Initial Test Pressure, inches H2O <br />7. Pressure after I minute, inches H2O <br />8. Pressure after 2 minutes, inches H2O <br />9. Pressure after 3 minutes, inches H2O <br />10. Pressure after 4 minutes, inches H2O <br />11. Pressure after 5 minutes, inches H2O <br />12 Allowable Final Pressure <br />13. Pass/Fail (Enter "GF" for Gross failure <br />Nitrogen introduction point. Phase I vapor coupler or Phase 11 vapor riser: <br />Record Vapor Coupler Integrity Test Assembly pressure after I minute: <br />Type of pressure device used, i; Manometer 1' Mechanical <br />Enter Calibration date for pressure(s) device (90 days) <br />0 Z- " Enter initial tank ullage pressure (Vent if over 0.5 in. w.c.) <br />3"i7,AEnter flowmeter rate, F (Must be I to 5 CFM) <br />351.4fl,v. Enter calculated ullage fill -time - t2 <br />Enter actual fill -time <br />�vl Enter ending value of drift test ( Must be 0.01 in. w.c. or less) <br />Tester: <br />Signature, <br />n,, <br />D <br />Tester ID.- <br />. -- 0 / <br />Test Date: 2- -&-a2 <br />V '0.7,0 1 <br />IF 2,2-13� <br />- M1111111 <br />Nip <br />Nitrogen introduction point. Phase I vapor coupler or Phase 11 vapor riser: <br />Record Vapor Coupler Integrity Test Assembly pressure after I minute: <br />Type of pressure device used, i; Manometer 1' Mechanical <br />Enter Calibration date for pressure(s) device (90 days) <br />0 Z- " Enter initial tank ullage pressure (Vent if over 0.5 in. w.c.) <br />3"i7,AEnter flowmeter rate, F (Must be I to 5 CFM) <br />351.4fl,v. Enter calculated ullage fill -time - t2 <br />Enter actual fill -time <br />�vl Enter ending value of drift test ( Must be 0.01 in. w.c. or less) <br />Tester: <br />Signature, <br />n,, <br />D <br />Tester ID.- <br />. -- 0 / <br />Test Date: 2- -&-a2 <br />V '0.7,0 1 <br />IF 2,2-13� <br />