My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2300 - Underground Storage Tank Program
>
PR0231901
>
COMPLIANCE INFO_2005-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:24 AM
Creation date
6/23/2020 6:53:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2018
RECORD_ID
PR0231901
PE
2361
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231901_3330 N AD ART_2005-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ILL CONTROL PROCEDURES SECTIO <br />SPILL CONTROL LEADER (12) ON DUTY SUPVR <br />(also oversees inspections of areas or <br />systems vulnerable to earthquakes) <br />THE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL (13) <br />AUTO TECH (2) <br />JANITOR <br />AUTHORIZED SPILL CONTROL STRATEGIES (14) <br />This business has authorized the above personnel to perform the action(s) indicated below to control spills of hazardous <br />materials on its property. Persons performing these tasks will possess written procedures for performing them and will have <br />received training on the procedures and equipment needed prior to carrying them out. Locations of needed equipment are <br />shown on the facility map. At a minimum our business must isolate the area of the spill and make notifications. <br />SlPILLS OF LIQUID MATERIALS <br />— <br />IF Plug and Patch Container 1� Build Retention Dike <br />9' Remove Sources of Ignition F Position Container so as to Stop Leak <br />(� Reduce Pressure in Container/System R Isolate Area and Make INotifications <br />r�; Neutralize Spilled Material 1r; Secure System Valves and Closures <br />I' Shutdown System Involved I' Apply Absorbent Material to Spill Area <br />F N/A <br />RELEASE OF COMPRESSED GASES SPILLS OF SOLID MATERIALS <br />{- Shut Off Valves/Systems i_ Cover Spill to Prevent Spread <br />F Ventilate Area of Release F; Neutralize Spilled Materials <br />Reduce Pressure in Container/System R Position Container so as to Stop Leak <br />F Suppress Vapors with Water y4Place Spilled Material into Drum or Bag <br />�� Isolate Area and Make Notifications i' �-; Isolate Area and Make Notifications <br />Flo Remove Sources of Ignition 1 N/A <br />i N/A <br />SPILLS OTHER <br />AUTHORIZED CLEANUP COMPANIES SECTION (15� <br />The following cleanup companies will be accessed in the event that our business must expend funds to clean up a hazardous <br />materials spill. <br />STATE CONTRACT <br />NAME 24-HOUR TELEPHONE NUMBER AGREEMENT/CONTRACT NO. <br />NAME 24-HOUR TELEPHONE NUMBER AGREEMENT/CONTRACT NO. <br />Submit Changes <br />
The URL can be used to link to this page
Your browser does not support the video tag.