Laserfiche WebLink
ATTAC NT 3 ` CUP Agreement #6C078013 <br />. Page 2 of 2 <br />Comments• / 1 �{ 6-k2yj 4i' ,� laT _ A , IA. <br />Items Requiring PollovwUp Actions: —5i$C L✓tl (ec, W !"Aes' a <br />lnstracdow: <br />Monthly visual inspection of the UST system must be conducted by a Designated UST Operator, who <br />possesses a current "California TEST System Operator" cetrtificatiou issued by the International Code <br />Council. <br />A copy of this monthly visual inspection, checklist must be provided to the UST Owner or Operator. <br />The Designated UST Operator must alert the UST Owner or -Operator of any condition discovercddurisng <br />the monthly visual inspection that'may require follov,&up actions, <br />The UST Owner or Operator must maintain a copy of this monthly visual inspection checklist an.0 all <br />attaclunwts for the previous 12 months. The records must be mair;tained an -site or, if approved by the <br />local agency, off- site at a readily available location. <br />September 2004 <br />60160 3E)Vd WiAOUS dHO T99BEV660ZT LZ:60 L00Z/90/90 <br />