Laserfiche WebLink
1, 0 <br />F. In -Tank Gauging / SIR Equipment: <br />11117=11 <br />11 <br />* In the Section H, below, describe how and when these deficiencies were or wM be corrected. <br />mum <br />Complete the following checklist: <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />JKM�l <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />Was accuracy of system product level readings teste(V <br />Was accuracy of system water level readings tested? <br />,BMW=, <br />i <br />Were all probes reinstalled properly? <br />RUIM, I MIMS I 11TWOR N I III I I'M 111, IM1111 MR, I IM -21 I <br />------ -- ----- <br />* In the Section H, below, describe how and when these deficiencies were or wM be corrected. <br />mum <br />Complete the following checklist: <br />H. Comments: <br />Page 3 of 3 03101 <br />For equipment start-up or annual equipment certification, was a leak simulated to verif� LLD perfonnance;l <br />tCheck all that app�y) Simulated leak rate: 8 3 g.p.h.1- U 0. 1 g.p.h - Ll 0.2 g.p.h. <br />Were a LLDs confirmed operational and accurate within regulator) reqwrements" <br />I <br />i <br />as the testing apparatus properb calibrated" <br />For mechanical LLDs. does the LLD restrict product flow if it detects a leak! <br />For electronic LLDs, does the turbine automaticall) shut off if the LLD detects a leak? <br />WIM x7r, LID U <br />or disconnected? <br />For electronic LLDs, does the turbine automaticall� shut off if an) portion of the monitoring s) stem <br />malfunctions or fails a test? <br />electronic LIDs, accessible wiring connections been visuill) inspected? <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />H. Comments: <br />Page 3 of 3 03101 <br />