My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2300 - Underground Storage Tank Program
>
PR0231901
>
COMPLIANCE INFO_2005-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:24 AM
Creation date
6/23/2020 6:53:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2018
RECORD_ID
PR0231901
PE
2361
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231901_3330 N AD ART_2005-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1, 0 <br />F. In -Tank Gauging / SIR Equipment: <br />11117=11 <br />11 <br />* In the Section H, below, describe how and when these deficiencies were or wM be corrected. <br />mum <br />Complete the following checklist: <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />JKM�l <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />Was accuracy of system product level readings teste(V <br />Was accuracy of system water level readings tested? <br />,BMW=, <br />i <br />Were all probes reinstalled properly? <br />RUIM, I MIMS I 11TWOR N I III I I'M 111, IM1111 MR, I IM -21 I <br />------ -- ----- <br />* In the Section H, below, describe how and when these deficiencies were or wM be corrected. <br />mum <br />Complete the following checklist: <br />H. Comments: <br />Page 3 of 3 03101 <br />For equipment start-up or annual equipment certification, was a leak simulated to verif� LLD perfonnance;l <br />tCheck all that app�y) Simulated leak rate: 8 3 g.p.h.1- U 0. 1 g.p.h - Ll 0.2 g.p.h. <br />Were a LLDs confirmed operational and accurate within regulator) reqwrements" <br />I <br />i <br />as the testing apparatus properb calibrated" <br />For mechanical LLDs. does the LLD restrict product flow if it detects a leak! <br />For electronic LLDs, does the turbine automaticall) shut off if the LLD detects a leak? <br />WIM x7r, LID U <br />or disconnected? <br />For electronic LLDs, does the turbine automaticall� shut off if an) portion of the monitoring s) stem <br />malfunctions or fails a test? <br />electronic LIDs, accessible wiring connections been visuill) inspected? <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />H. Comments: <br />Page 3 of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.