My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14971
>
2300 - Underground Storage Tank Program
>
PR0231911
>
COMPLIANCE INFO_2003-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:33 AM
Creation date
6/23/2020 6:53:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2011
RECORD_ID
PR0231911
PE
2361
FACILITY_ID
FA0000540
FACILITY_NAME
COUNTRYSIDE LIQUORS & GAS
STREET_NUMBER
14971
Direction
N
STREET_NAME
STATE ROUTE 88
City
LODI
Zip
95240
APN
06316025
CURRENT_STATUS
01
SITE_LOCATION
14971 N HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231911_14971 N HWY 88_2003-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
421
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-• i <br /> Le kw�ffizffel ll <br /> Fall Inspection Date: <br /> ,y Name: IU7 <br /> ,�#VII VV <br /> Facility Address: S <br /> k <br /> • <br /> • .�'s Name: ICC Service Technician/installer■ .. Date: <br /> AgQw <br /> Til 99, WEPM, <br /> SERVICE SERVICE <br /> -- detector <br /> Spill bucket <br /> ■ mechanical Model: <br /> 0 electronic Serial#: 0 1 hour hydrostatic 0 Incon TS-STS <br /> 0 Caldwell System 0 Other <br /> ■ line test2Lo.• f <br /> Leak detector <br /> ■ mechanical Model: <br /> ■ electronic Serial ■ <br /> ■ - programmed <br /> Caldwell System 0 Other <br /> Leak detector <br /> Spillbucket ■ minimum 5 gallon <br /> ■ mechanical Model: <br /> 0 electronic Serial#: ■ Caldwell System ■ Other <br /> sensor Primary <br /> 0 positive shutdown Model: <br /> Nil, ■ • <br /> si <br /> minutes <br /> ■ t. <br /> sensor Secondary containment testing for: <br /> ■ positive shutdownModel: i Piping <br /> ■ fail - • <br /> ■ a sensor <br /> Testing for the above components are next due • <br /> 0 positive shutdown Model: <br /> ■ fail safe Serial <br /> installation,6 months after,and every 36 months thereafter. <br /> aDrop tube with mechanicaloverfill at • f • start of r • • panel <br /> Drop tube with mechanical overfill at 95% i Corrosion protection <br /> Overfill prevention (see LG letter 150-1) <br /> TIM <br /> k �.�► � <br /> D Inspecto <br />
The URL can be used to link to this page
Your browser does not support the video tag.