My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14971
>
2300 - Underground Storage Tank Program
>
PR0231911
>
COMPLIANCE INFO_2003-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:33 AM
Creation date
6/23/2020 6:53:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2011
RECORD_ID
PR0231911
PE
2361
FACILITY_ID
FA0000540
FACILITY_NAME
COUNTRYSIDE LIQUORS & GAS
STREET_NUMBER
14971
Direction
N
STREET_NAME
STATE ROUTE 88
City
LODI
Zip
95240
APN
06316025
CURRENT_STATUS
01
SITE_LOCATION
14971 N HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231911_14971 N HWY 88_2003-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
421
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 0 <br /> RE: 76—Lodi"Countryside" 14971 N Hwy 88 Lodi CA 95240 SR0055727 <br /> d. Each person installing or testing any component must hold a certificate of <br /> training from the manufacturer of that component. <br /> 4. Contact Aris Cacapit(468-3453)to arrange the following inspection(s)(a 48-hour notice <br /> is required): <br /> a. The EHD must witness the functionality of the monitoring system to ensure that <br /> monitoring has been restored to meet the requirements of California Code of <br /> Regulations Title 23 and the Health& Safety Code. <br /> b. If a"cold start"is conducted,then before the alarm history is cleared by the"cold <br /> start",a current printout must be created and available for EHD inspection. <br /> Inspection may occur during the functionality test. <br /> 5. If concrete is being broken near the UST,pipeline and tank integrity testing must be <br /> performed by a SWRCB licensed tank tester in accordance with the manufacturer's <br /> guidelines. Results must be received by the EHD within seven days of returning the <br /> facility to operating condition. <br /> 6. An"Underground Storage Tank Certification of Installation/Modification" form(form C) <br /> shall be submitted by the owner or the owners'agent[pursuant to(CCR)2635(d)] before <br /> this upgrade will be considered complete by EHD. <br /> 7. Permit expires 180 days from date of approval. If an extension to the expiration date is <br /> required, a written request must be submitted to the EHD prior to the expiration date. <br /> Thank you, <br /> )rfj& CA� <br /> Aris Cacapit,ES <br /> Environmental Health Specialist <br /> 600 E.Main St. <br /> Stockton,CA 95202 <br /> (209)468-3453 <br /> acacapit@sjcehd.com <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.