Laserfiche WebLink
p.7 <br /> Mh <br /> NIFIED PROGRAM CONSOLIDATED FOR <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(P e I of 2) <br /> a9�-1 <br /> TYPE OF ACTION ❑1.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> 490 <br /> PLAN TYPE I.MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(Sm <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agener•Use OnW <br /> BUSINESS NA ti1E(Same as FACILITY NAME) p �' If 5 ` <br /> 103. CITY r too. <br /> BUSINESS SITE ADDRESS t t <br /> II.EQUIFNIENT TING AND PREVENTIVE MAINTEN CE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors.a .)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work mu t be performed by qualified personnel. <br /> S23 CCR 2§ 632,2634.2638,2.6411 _ 490.33 <br /> MONITORING EQUIPMENT IS SERVICED ~�� 1.ANNUALLY [1 99.OTHER(Spi-ify): �90-3b <br /> III.MONITORING LOCATIONS . <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. CW 2.SITE PLOT PLANI141AP PREM 'LSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49a4 <br /> IV.'TANK MONITORING IS PERFORMED USING TIIE FOLLOWING n'iETHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT aso.s <br /> VAULT(S)WITH AUDIBLE AND a'ISLtAL ALARMS. (23 CCR§2632,2634) 490,6 <br /> SECONDARY CONTAINMENT IS; -a.DRY [:1 b:LIQUID FILLED ❑ e_PRESSURIZED E]d.UNDER VACUUM - --- --� _-_- <br /> ------'----------^---- ------------------ 490.7. 490-8 <br /> _ <br /> PANEL MANUFACTURER: 6 ? MODEL it: �`1 <br /> 490.9. 3 MODEL#(S): 0 <br /> -LEAK SENSOR MANUFACTURER: iJ�CcfPr �cry ,iTOR SINGLE�Y.4LL TAtiK {23 CCR§2643) 490-11 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO�10. 490-13 <br /> a°0 12' MODEL#: <br /> PANEL MANUFACTURER: 490.15 <br /> - IN-TANK-_-_--------------------------------.-----_----.-.__-._-------------ago=la-__-___------__---------------------_----- - <br /> __ 1N-TANK <br /> PROBE MA1NU_FAC_TUREWMODEL <br /> -------..-__-..._--___.-__----------------._.----"------------------- 490-16 <br /> -- LEAK TEST FREQUENCY:- ❑ a.CONTINUOUS ❑ b.DAILYlNIGHTLY ❑ c.WEEKLY <br /> 490-37 <br /> ❑ d.MONTHLY ❑_e_OTHER(Specify):._.- ----•------ ---------------------------------- ----- <br /> ---- <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specs 490-19 <br /> 49440 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 49A21 <br /> E] 4.WEEKLY MANUAL TANK GAUGING(.MTG)(23 CCR§2645). TESTING PERIOD: a.36 HOURS ❑ b.60 HOURS 490-22 <br /> 49,]•23 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1)1 490-24 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 40-25 <br /> 49 -26 <br /> ❑99.OTHER (Specify): a9a a7 <br /> V.PIPE 1�IONIT®RING IS PERFORVIEDUSING THE_FOLLOING METHODS)(.Check all t1lat.agpl)) <br /> 1.CONTI>UOUS MONITORING OF PIPE+PIPING SUD1P{S)A`D OTHER SECONDARY COISTAINMENT WITH AI DIBLE AND <br /> 490.Z8 <br /> VISUAL ALARMS. (23 CCR§2636) 490-29 <br /> SECONDARY CONT-AINMENT IS:Ira.DRQ' [:1b.LIQUID FILLED ❑c.PRESSURIZED_❑d.UNDER VACUUM ----____ __-,__-_ <br /> _-____._.__-._____ ___.__ 490-31 <br /> _. <br /> PANEL MANUFACTURER: / MODEL#: L S 3 ------- <br /> e�IL ._.---.,�- '490-32MODEL 490-33 <br /> LEAK SENSOR MAN_UFA_C_TURER: &40 -a4`T -- '-"-"""�- a9a 3a <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. Pa.YES ❑b.NO <br /> ago.35 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b.NO <br /> Tr 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW'WHEY A LEAK IS DE'T'ECTED 123 CCR 29 _ 490-36 <br /> ---.-ago 3� MODEL f#(S):------ -- Y -- 90-36 <br /> MLLD MANUFe1CTURER(S): <br /> 49,439 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAKTESTS (23 CCR 263 ) --�- <br /> ---_------.- <br /> 90-41 <br /> _a <br /> ELLD . <br /> ----- <br /> a9aaz <br /> - --PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490.43 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUIhfP SHUTDOWN. ❑a.YES ❑b.NO <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ <br /> a.YES Q b.NO s9o-44 <br /> ❑ 4.PIPE INTEGRITY TESTING ago-0s 4904649047 <br /> TEST FRE UENCY ❑ a.ANNUALLY [:1b.EVERY 3 YEARS ❑ c.OTHER(S i ) 490-48 <br /> ❑ 5.VISUAL PIPE MONITORING. <br /> 490-49 <br /> FREQUENCY ❑ a.DAILY ❑ b. WEEKLY ❑c.MIN.MONTHLY Fc EACH TIME SYSTEM OPERATED° <br /> .Akl w d for moniwri orufthAed emc SnCygercrator fuel iai enh• HSC'25281" ) 490450 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPfION CRITERIA 123 CCR§2636(a)(3)1. <br /> `4 REGI LATER PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> ❑ 7. <br /> 490-51 490-52 <br /> 490.53 <br /> ❑ 99.OTHER(Specify) <br /> UPCF LIST-D(1212007)14 <br />