My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14971
>
2300 - Underground Storage Tank Program
>
PR0231911
>
COMPLIANCE INFO_2003-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:33 AM
Creation date
6/23/2020 6:53:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2011
RECORD_ID
PR0231911
PE
2361
FACILITY_ID
FA0000540
FACILITY_NAME
COUNTRYSIDE LIQUORS & GAS
STREET_NUMBER
14971
Direction
N
STREET_NAME
STATE ROUTE 88
City
LODI
Zip
95240
APN
06316025
CURRENT_STATUS
01
SITE_LOCATION
14971 N HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231911_14971 N HWY 88_2003-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
421
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equiont: Z_'Check this box if tankwing is used only for inventory control. <br /> U Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the folio ing checklist: <br /> U Yes U No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> LJ Yes U No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> U Yes LJ No* Was accuracy of system product level readings tested? <br /> U Yes U No* Was accuracy of system water level readings tested? <br /> Ll Yes I Ll No* Were all probes reinstalled properly? <br /> Ll Yes <br /> U Ko* F Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): U Check this box if LLDs are not installed. <br /> Cquiplete the folio ing checklist: <br /> Yes Ll No* For equipment start-up or annual equipment erti ication, was a leak simulated to verify LLD performance? <br /> e LJ N/A (Check all that apply) Simulated leak rate:73 g.p.h.; L] 0.1 g.p.h; Ll 0.2 g.p.h. <br /> U Yes Q1 No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes U No* Was the testing apparatus properly calibrated? <br /> a EA Yes Ll No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> Y <br /> U N/A <br /> FLUYes E3 No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> 13 Yes U No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ig N/A or disconnected? <br /> Ll Yes Ll No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> -5 N/A or fails a test? I <br /> Ll Yes U No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> W N/A , <br /> U No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comm ents: DSL <br /> M <br /> Oct <br /> ON, _S3 <br /> Pace 3 of 3 <br /> 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.