Laserfiche WebLink
ENVIRO ENTALa HEALTH EPARTMENT <br />1 OUl/y <br />OP' C <br />Donna K. Heran, R.E.H.S. <br />Director <br />Laurie A. Cotulla, R.E.H.S. <br />°v�iFOR-AP Assistant Director <br />March 28, 2007 <br />Mark Vendeiro <br />MVP Petroleum Engineering, Inc. <br />PO Box 281 <br />Folsom, CA 95763 <br />Re: Countryside Mini Mart <br />14971 N. Hwy 88 <br />Lodi, CA 95240 <br />SAN JOAQUIN COUNTY <br />304 East Weber Avenue, Third Floor <br />Stockton, California 95202-2708 <br />Telephone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />Website: www.sjgov.org/ehd/ <br />Program Coordinators <br />Carl Borgman, R.E.H.S. <br />Mike Huggins, R.E.H.S., R.D.I. <br />Margaret Lagorio, R.E.H.S. <br />Robert McClellon, R.E.H.S. <br />Jeff Carruesco, R.E.H.S. <br />Kasey Foley, R.E.H.S. <br />Your application for a permit, SR0050033, to cut concrete and expose the product lines for the exploration <br />of a leak at the above referenced address has been received and approved with the following conditions: <br />1. Contact the local fire department and San Joaquin Valley Air Pollution Control District for any <br />applicable permits. <br />2. Any changes shall be submitted to this office for approval prior to commencing work. All new <br />addenda supercede the previous ones. <br />3. At least one person who holds a current International Code Council (ICC) UST Service Technician <br />certification and manufacturers' certificate of training for all components installed or tested must be <br />onsite when work is performed. <br />4. Each person installing or testing any component must hold a certificate of training from the <br />manufacturer of that component. <br />5. Contact this office for the following inspections: <br />a. One hour soap test of supreme unleaded product line. <br />b. 24 hour or equivalent lake test of dispenser pan 1/2. <br />6. Allow 48-hour notice for all appointments. <br />7. Once concrete is poured, all lines shall have an integrity test performed in accordance to manufacturer. <br />Results must be received by EHD within 7 days of returning the site to operating condition. <br />8. Complete and submit a copy of a UST Installation Certificate of Compliance (Former Form C) for <br />each tank no later than 30 days after work is completed. <br />9. This permit expires 90 days from the approval date <br />Contact me at (21 <br />Thank you, <br />any questions or to schedule the inspections at the above listed sites. <br />Willy Ng, REHSI,./ <br />Senior Registered Environmental Health Specialist <br />