Laserfiche WebLink
• UNDERGROUND STORAGE TANK MONITORING PLAN <br /> ►' For use by(!nidocs Member Agencies or where approved by your Local Jurisdiction . <br /> Authority Cited: Title 23 CCR,Sections 2632(d)(1),2634(d)(2),and 2641(h) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Mol. <br /> PLAN TYPE A MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. M02. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFbRMATION id tlx �" t fN T Y <br /> FACILITY ID#(Agency Use Only) 77 <br /> t� T 1 Ejh} <br /> FACILITY NAME M03 <br /> FACILITY SITE ADDRESSIS.��'t,/; 1 Inti CITY (' �1 <br /> MOS. <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in M06 <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY Mol. <br /> ❑ 99.OTHER(Specify): <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV* TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) M10 <br /> ❑ I.CONTINUOUS ELECTRONIC MONITORINQ OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT/1S: .a.DRY El b.LIQUID FILLED ❑ c.UNDER PRESSURE d.UNDER VACUUM Mn. <br /> PANEL MANUFACTURER: If c.-Coc IZ.OIJT M12. MODEL#: TU MI3. <br /> LEAK SENSOR MANUFACTURER: n( ,A ip"CcT M14. MODEL#(S): ry I (O M15 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: I/�L�f=p�/J /LQ8% MI6. MODEL#: I=oy M17. <br /> IN-TANK PROBE MANUFACTURER:7L) ✓Gc y' Mia MODEL#(S): '(,{q MM <br /> LEAK TEST FREQUENCY: a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY I M <br /> d.MONTHLY ❑ e.OTHERM21 <br /> (Specify): <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): M22. M23. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 b.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS b.60 HOURS M25. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): M26 M27. <br /> ❑ 6.VISUAL MONITORING DONE: a.DAILY ❑ b.WEEKLY(Requires agency approval) <br /> ❑ 99.OTHER(Specify): <br /> Meg. <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Mao. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: � a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M31. <br /> PANEL MANUFACTURER: M32 MODEL#: jru M33 <br /> LEAK SENSOR MANUFACTURER: ItL4-) Jjx./t CST M" MODEL#(S): X' M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? a.YES ❑ b.NO M36. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWIS <br /> a.YES [Ib.NO M37. <br /> 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS ANDRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS OETECTE-7D�,, <br /> MLLD MANUFACTURER(s): Lfl Owls r Mag. <br /> MODEL#(S): X C.-p M39 <br /> 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: ACC 0)3C,/(LZT M40. ODEL#: X 1_,/� M41. <br /> PROGRAMMED LINE INTEGRITY TESTS: Ela.MINIMUM MONTHLY 0.2 g.p.h. b.MINIMUM ANNUAL 0.1 g.p.h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? a.YES ❑ b.NO M43. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? a.YES ❑ b.NO M44 <br /> 4.INTEGRITY TESTING <br /> TEST FREQUENCY: a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45. M46. <br /> 5.VISUAL MONITORING DONE: a.DAILY ❑ b.WEEKLY* ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED** M47. <br /> *Requires agency approval **Allo%ed for monitoring of unburied emergency generator fuel piping onh.per HSC§25281.5(6)(3) <br /> 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) M48 <br /> UN-022A-1/5 www.unidocs.org Rev.10/14/03 <br />