Laserfiche WebLink
i <br /> Underground Storage Tank Monitoring Plan—Page 2 of 2 <br /> 'r <br /> VI.DISPENSER MONITORING <br /> MONITORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M50. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) <br /> PANEL MANUFACTURER: V L�CA .r1- l 3 T151 MODEL#: � 3 SU Msz. <br /> LEAK SENSOR MANUFACTURER: _.b �K1 JL,U T Mss. MODEL#(S): X M54. <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? a.YES ❑ b.NO M55. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? a.YES ❑ b.NO M56. <br /> WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? )KI a.YES ❑ b.NO M57. <br /> ❑ 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY MANUFACTURER: M58 MODEL#(S): M59- <br /> 3.VISUAL MONITORING DONE: a.DAILY ❑ b.WEEKLY(Requires agency approval) M60. <br /> 4.NO DISPENSERS <br /> ❑ 99.OTHER(Specify) M61. <br /> VII. "ENRANCED=LEAK DETECTION <br /> ❑ 1.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M'o. <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. TRAINING <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) Mao <br /> l.-W THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3. THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of January 1,2005) <br /> 4. CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> 99. ❑ OTHER(Specify): Mal. <br /> Personnel with UST monitoring responsibilities are familiar with all'of the above documents relevant to theirjob duties and can access those documents when needed. <br /> By January I,2005,this facility will have a"Designated UST Operator"who has passed the California UST Sytem Operator Exam administered by the International <br /> Code Council(ICC). By July I,2005,and annually thereafter,the "Designated UST Operator"will train facility employees in the proper operation and maintenance <br /> of the UST systems.This training will include,but is not limited to,the following: <br /> ➢ Operation ofthe UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the leak detection equipment. <br /> ➢ The facility employee's role with regard to spills and overfills. <br /> ➢ Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after July 1,2005,the initial training will be conducted within 30 days of the date of hire. <br /> IX. COMMENTS/ADDITIONAL INFORMATION <br /> Please use this section to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency): Mss. <br /> Note regarding Section X.Pending certification of a Designated UST Operator,the following person has authority for performing the monitoring <br /> activities and maintaining leak detection equipment covered by this plan. NAME: JOB TITLE: <br /> X. PERSONNEL RESPONSIBILITIES <br /> AS OF JANUARY 1, 2005, THE "DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT <br /> APPLICATION—FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING <br /> LEAK DETECTION EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS <br /> OF THE FACILITY'S UST SYSTEMS IN ACCORDANCE WITH 23 CCR§2715(b). <br /> XI. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> OWNERIOPE OR SIGNATURE REPRESENTING DATE: M91. <br /> Owner M90. <br /> Operator <br /> OWNER/OPERATOOR NAME(print): hf9' OW(N�ER/OPERATOR TITLE: M93. <br /> �'\Q r b�; Q NB' <br /> (Agency Use Only) This plan has been reviewed and: ❑Approved ❑Approved With Conditions ❑Disapproved <br /> Local Agency Signature: Date: <br /> Comments/Special Conditions: <br /> UN-022A-3/5 www.unidocs.org Rev.10/14/03 <br />