Laserfiche WebLink
P.9 <br /> UNDERGROUND STORAGE TANK <br /> RE <br /> SPONSE PLAN- PAGE 1 (One form per facility) <br /> R01. <br /> TYPE OF ACTION ❑ I.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (.Agency Use Ont,:y <br /> Rol. <br /> BUSINESS NAME(Same as FACILITY DAME) <br /> BUSINESS SITE ADDRESS R03. CITY ffI <br /> 19121 <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and prolcedures in the facility's Hazardous Materials <br /> Business Plan. <br /> > !£safe to do ao,facility personnel will take immediate measures to control Or stop any release(e.g.,activate pumps tat-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> > Any release to secondary containment will be purr?ed or otherwise removed within a time consistent with the ab lity of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Reco•ered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> Absorbent maierial will be used to contain and clean up manageable spills of hazardous materials. Absorbent m terial which has become too saturated to be <br /> c0ective or which is no longer intended for use wilt be managed as hazardous waste unless a waste determination in ccordance with 22 CCR§66262.11 finds that j <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed <br /> appropriately. <br /> > Facility personnel will determine whether any water removed from secondary containment systems,or from c1len-up activity, has been in contact with any <br /> hazardous material.It the water is contaminated,it will be managed as hazardous waste unless a waste determinati in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors'),it is contaminated. A thick 2oating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)from sumps,.spill containers,etc.will not be disposed to storm water systems. <br /> > We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; I <br /> 2. Secondary containment is prone to damage from any equipment used to remove or cleanup hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the productiwaste stored in the primary containment systetr., is placed inside secondary containment to treat or neutralize <br /> released praducvwaste,and the added material or resulting material from such a combination is not compatible with secondary containment. ; <br /> III. SPILL CONTROL AND CLEAN-UP EUIPMET <br /> PERIODIC NIAUSTENANCE: Spill control and clean-up equipment kept permanently on-site is Fsted in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE 1F NEEDED: (Co tete ly if liable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> R10. R20. R31, <br /> Rt 1. R21. R31. <br /> R12. IL22, R31 <br /> R13, t4^3. R33. <br /> Rld. R24. Ria. <br /> R15. R25, R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)ISIARE RESPONSIBLE FOR AUTHORIZING ANY WORK.NFCESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Rao. TITLE <br /> ,Z54. <br /> NAME R41- TITLE r <br /> e R52. <br /> NAME R42. TITLE <br /> R53. <br /> xA.atE Rai. 1 TITLE <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUI•HORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE IMADE AS FOLLOWS: <br /> Q Additional system testing or data collection [*Inspection by qualified persons O Recalibratior.of equipment <br /> Other: <br /> Reo. <br /> UST Response Plan(312008)-V3 <br />