Laserfiche WebLink
n <br />u <br />SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page of <br />Test Method Developed By: X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />Other (Specie) <br />Test Method Used: X Pressure ❑ Vacuum Hydrostatic <br />Other (Spec) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Replaced Test Boot on Super 91 Secondary Pipe at Piping Sump. Old Test Boot had bubbles on glued seam. <br />Piping Run #1 <br />Piping Run #2 Piping Run #3 Piping Run # <br />Piping Material: <br />Fiberglass <br />Fiberglass Fiberglass <br />Piping Manufacturer: <br />Ameron <br />Ameron Ameron <br />Piping Diameter: <br />3" <br />3" 3" <br />Length of Piping Run: <br />Approx. 55' <br />Approx. 35' Approx. 35' <br />Product Stored: <br />Regular 87 <br />Super 91 Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot at <br />UDC#3&4 <br />Test boot at Test boot at <br />UDC#3&4 UDC#3&4 <br />Wait time between applying <br />pressure and starting test: <br />15 Minutes <br />15 Minutes 15 Minutes <br />Test Start Time: <br />9:20 <br />9:40 9:15 <br />Initial Reading (Ri): <br />3 Psi <br />3 Psi 3 Psi <br />Test End Time: <br />10:20 <br />10:40 10:15 <br />Final Reading (RF): <br />3 Psi <br />3 Psi 3 Psi <br />Test Duration: <br />1 Hour <br />1 Hour 1 Hour <br />Change in Reading (RF-Ri): <br />0 Psi <br />0 Psi 0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi No Loss in Psi <br />Test Result: <br />Pass <br />Pass Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Replaced Test Boot on Super 91 Secondary Pipe at Piping Sump. Old Test Boot had bubbles on glued seam. <br />