Laserfiche WebLink
RECEIVED <br />SWRCB, January 2006 <br />Spill Bucket Testing Report Form IADP ) _� 2 0 l�� <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (f applicable), should be provided to the facility owner/operator for submittal to tf ency. <br />1. FACILITY INFORMATION HEALTH DEPARTMENT <br />Facility Name: COUNTRYSIDE MARKET Date of Testing: 3/21/2016 <br />Facility Address: 14971 N. HWY 88 LODI, CA 95240 <br />Facility Contact: RUPI Phone: <br />Date Local Agency Was Notified of Testing :3/7/2016 <br />Name of Local Agency Inspector (f present during testing): ARIS C. <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: AFFORDA TEST 416 2"d Street Galt, CA 95632 (209) 744-0112 Fax: (209) 744-0116 <br />Technician Conducting Test: ❑ Lyle D. Nimmo ® Zane A. Nimmo ❑ David A. Winkler ❑ Felix G. Ramirez <br />5249115 -UT 5263322 -UT 5263373 -UT 5273934 -UT <br />Credentials: ® ICC Service Tech. ® SWRCB Tank Tester <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: ® Hydrostatic ❑ Vacuum ❑ Other <br />Test Equipment Used: TAPE MEASURE, <br />H2O <br />Equipment Resolution: 1/16" <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc.) <br />1 87 2 <br />3 91 <br />4 DIESEL <br />Bucket Installation Type: <br />® Direct Bury ❑ Direct Bury <br />❑ Contained in Sump ❑ Contained in Sump <br />® Direct Bury <br />❑ Contained in <br />Sump <br />® Direct Bury <br />❑ Contained in <br />Sump <br />Bucket Diameter: <br />11 <br />11 <br />11 <br />Bucket Depth: <br />14 <br />11 <br />11 3/4 <br />Wait time between applying <br />vacuum/water and start of test: <br />Test Start Time (Ti): <br />0900 <br />0900 <br />0900 <br />Initial Reading (111): <br />13 - <br />10 <br />10 3/4 <br />Test End Time (TF): <br />1000 <br />1000 <br />1000 <br />Final Reading (RF): <br />13 - <br />10 <br />10 3/4 <br />Test Duration (TF — Ti): <br />HR HR <br />HR <br />HR <br />Change in Reading (RF - Ri): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />Z Pass ❑ Fail ❑ Pass ❑ Fail <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature �--'� Date:_ 3-21-16 <br />State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />